Cable ops
Seismic survey in progress until further notice by M/V geco angler towing five mile long cable in area…
HYDROPAC 953/01
- issued
- 2001-06-22 00:57Z
- status
- cancelled 2001-08-01 14:19Z (archive)
- cancels
- HYDROPAC 950/01HYDROPAC 932/01
- authority
- AUSCOAST 168/01 POR EGC 53751 220026Z JUN 01; AUSCOAST POR EGC 53749 220025Z JUN 01; AUSSAR POR EGC 53723 211655Z JUN 01
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V GECO ANGLER TOWING FIVE MILE LONG CABLE IN AREA BETWEEN 17-00S 18-30S AND 116-30E 118-00E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 950/01, SEARCH SUSPENDED. 3. CANCEL HYDROPAC 932/01.
Timeline
- Seismic survey in progress until further notice by M/V geco angler towing 4.5 mile long cable in area…cancels · 2001-06-19
- Distress signal received on 121.5 mhz vicinity 31-35S 153-02E at 211153Z juncancels · 2001-06-21
- Seismic survey in progress until further notice by M/V geco angler towing 4.5 mile long cable in area…replaced · 2001-06-19
- Distress signal received on 121.5 mhz vicinity 31-35S 153-02E at 211153Z junreplaced · 2001-06-21
- Survey operations in progress until 10 aug by vessel towing 3500 meter long cable in area between 33-00N…cancelled by · 2001-08-01
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.