Cable ops
Seismic survey by M/V hawk explorer towing 5.4 mile long cables: a. 23 jun in area bound by 13-34.6S…
Brazil-east Coast · HYDROLANT 1368/12
- issued
- 2012-06-23 14:35Z
- status
- cancelled 2012-06-28 00:01Z (archive)
- cancels
- HYDROLANT 1364/12
- authority
- NAVAREA V E 829/12 231256Z JUN 12.
- sea
- South Atlantic Ocean
- position
- -14.462, -37.383
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-EAST COAST.
1. SEISMIC SURVEY BY M/V HAWK EXPLORER TOWING
5.4 MILE LONG CABLES:
A. 23 JUN IN AREA BOUND BY
13-34.6S 038-35.5W, 13-00.8S 038-02.8W,
13-00.9S 036-16.6W, 13-31.8S 036-22.6W,
16-00.0S 036-19.5W, 16-00.4S 037-43.9W,
15-27.5S 038-15.3W, 14-44.9S 038-35.5W.
B. 24 THRU 26 JUN IN AREA BOUND BY
13-00.8S 037-30.0W, 14-00.0S 037-30.0W,
14-00.0S 037-00.0W, 16-00.0S 037-00.0W,
16-00.0S 036-19.5W, 14-00.0S 037-00.0W,
13-00.9S 036-16.6W.
C. 27 JUN IN AREA BOUND BY
13-34.6S 038-35.5W, 13-00.8S 038-02.8W,
13-00.9S 036-16.6W, 13-31.8S 036-22.6W,
16-00.0S 036-19.5W, 16-00.4S 037-43.9W,
15-27.5S 038-15.3W, 14-44.9S 038-35.5W.
SEVEN MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 1364/12.
3. CANCEL THIS MSG 28 JUN.
This area · cable & pipeline work
243 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
18
- Underwater operations in progress until 29 may by cableship ile de brehat in vicinity of trackline joining…2018-01-30
- Cable repair operations 23 feb thru 25 mar by M/V teneo vicinity of trackline joining 13-00.42S 038-27.59W,…2015-02-23
- Seismic survey 04 apr thru 25 may by M/V l'atalante towing 4850 meter long cable in area bound by 09-06.00S…2014-04-10
- Seismic survey in progress until 10 aug by M/V ocean endeavour towing 12 five mile long cables in area bound…2014-02-25
- Cable laying operations 020100Z to 061100Z aug along trackline between 11-47.59S 037-22.28W and 11-47.29S…2013-07-31
- Cable laying operations 14 thru 24 feb by cableship ile de batz along trackline between 13-00.81S 038-27.13W…2013-02-13
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.