Cable ops
Cable laying operations 14 thru 24 feb by cableship ile de batz along trackline between 13-00.81S 038-27.13W…
Brazil-east Coast · HYDROLANT 396/13
- issued
- 2013-02-13 00:54Z
- status
- cancelled 2013-02-25 00:01Z (archive)
- authority
- NAVAREA V E 177/13 122342Z FEB 13.
- position
- -13.804, -36.800
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-EAST COAST. 1. CABLE LAYING OPERATIONS 14 THRU 24 FEB BY CABLESHIP ILE DE BATZ ALONG TRACKLINE BETWEEN 13-00.81S 038-27.13W AND 14-35.68S 035-08.83W. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 25 FEB 13.
This area · cable & pipeline work
363 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
18
- Underwater operations in progress until 29 may by cableship ile de brehat in vicinity of trackline joining…2018-01-30
- Cable repair operations 23 feb thru 25 mar by M/V teneo vicinity of trackline joining 13-00.42S 038-27.59W,…2015-02-23
- Seismic survey in progress until 30 oct by M/V ramform viking towing 12 9500 meter long cables in area bound…2014-09-24
- Seismic survey in progress until 30 oct by M/V ramform viking towing 12 9500 meter long cables in area bound…2014-09-18
- Seismic survey in progress until 30 oct by M/V ramform viking towing 12 9500 meter long cables in area bound…2014-09-17
- Seismic survey 04 apr thru 25 may by M/V l'atalante towing 4850 meter long cable in area bound by 09-06.00S…2014-04-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.