Cable ops
Seismic survey by M/V discoverer towing 10000 meter long cables: a. 04 dec in area bound by 07-40S 033-30W,…
HYDROLANT 2361/09
- issued
- 2009-12-04 02:34Z
- status
- cancelled 2009-12-08 14:40Z (archive)
- cancels
- HYDROLANT 2351/09
- authority
- NAVAREA V E 2528/09 040048Z DEC 09.
- sea
- South Atlantic Ocean
- position
- -8.542, -34.169
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY BY M/V DISCOVERER TOWING
10000 METER LONG CABLES:
A. 04 DEC IN AREA BOUND BY
07-40S 033-30W, 07-50S 033-40W,
08-25S 031-55W, 08-15S 032-05W.
B. 05 DEC IN AREA BOUND BY
08-25S 031-55W, 08-15S 032-05W,
08-05S 033-25W, 08-10S 033-35W.
C. 06 DEC IN AREA BOUND BY
08-05S 033-25W, 08-10S 033-35W,
08-40S 034-25W, 08-50S 034-35W.
D. 07 DEC IN AREA BOUND BY
08-50S 034-35W, 08-40S 034-25W,
09-05S 032-50W, 09-10S 033-00W.
E. 08 DEC IN AREA BOUND BY
09-10S 033-00W, 09-05S 032-50W,
09-30S 032-50W, 09-40S 033-00W.
F. 09 DEC IN AREA BOUND BY
09-40S 033-00W, 09-30S 032-50W,
09-10S 034-40W, 09-20S 034-50W.
SEVEN MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 2351/09.
3. CANCEL THIS MSG 10 DEC.
This area · cable & pipeline work
93 within 180 nm since 2000 · 0 in the last 12 months · 0 in force now
00
05
10
15
17
- Seismic survey 21 thru 28 jan by M/V bgp challenger towing 12000 meter long cable in area bound by 13-49S…2017-01-19
- Seismic survey 14 thru 21 jan by bgp challenger towing 12000 meter long cable in area bound by 13-49S…2017-01-10
- Cable laying operations in progress until 22 apr by M/V ile de batz along trackline joining 03-44.95S…2013-04-11
- Cable laying operations 09 thru 22 apr by M/V ile de batz along trackline between 03-44.95S 038-26.81W and…2013-04-08
- Seismic survey in progress until 28 feb by M/V veritas vantage towing 5.4 mile long cable in area bound by…2010-02-23
- Seismic survey in progress until 26 feb by M/V veritas vantage towing 5.4 mile long cable in area bound by…2010-02-19
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 070259Z dec by M/V discoverer towing 10000 meter long cables in areas bound…cancels · 2009-12-03
- Seismic survey in progress until 070259Z dec by M/V discoverer towing 10000 meter long cables in areas bound…replaced · 2009-12-03
- Seismic survey by M/V discoverer towing 10000 meter long cables: a. 08 dec in area bound by 09-00S 033-35W,…cancelled by · 2009-12-08
Nearby now · within 120 nm
- Tamandare light 08-45.57S 035-06.08W unlit until 02 novNav aids · 56.9 nm
- Maceio light 09-41.03S 035-43.38W unlit until 31 octNav aids · 114.8 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.