Cable ops
Cable laying operations 09 thru 22 apr by M/V ile de batz along trackline between 03-44.95S 038-26.81W and…
Brazil-northeast Coast · HYDROLANT 885/13
- issued
- 2013-04-08 23:54Z
- status
- cancelled 2013-04-11 07:44Z (archive)
- authority
- NAVAREA V 107/13 082333Z APR 13.
- position
- -7.430, -35.445
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-NORTHEAST COAST. 1. CABLE LAYING OPERATIONS 09 THRU 22 APR BY M/V ILE DE BATZ ALONG TRACKLINE BETWEEN 03-44.95S 038-26.81W AND 11-06.66S 032-26.62W. TWO MILE BERTH REQUESTED. 2. CANCEL THIS MSG 23 APR 13.
This area · cable & pipeline work
91 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
17
- Underwater operations in progress until 062222Z jun by cableship ile de brehat along trackline joining…2017-05-20
- Seismic survey 21 thru 28 jan by M/V bgp challenger towing 12000 meter long cable in area bound by 13-49S…2017-01-19
- Seismic survey 14 thru 21 jan by bgp challenger towing 12000 meter long cable in area bound by 13-49S…2017-01-10
- Cable laying operations in progress until 22 apr by M/V ile de batz along trackline joining 03-44.95S…2013-04-11
- Seismic survey in progress until 28 feb by M/V veritas vantage towing 5.4 mile long cable in area bound by…2010-02-23
- Seismic survey in progress until 26 feb by M/V veritas vantage towing 5.4 mile long cable in area bound by…2010-02-19
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.