Cable ops
Seismic survey in progress until 07 aug by M/V mezen towing 8000 meter long cable in area bound by 02-30N…
HYDROLANT 2732/00
- issued
- 2000-08-05 07:10Z
- status
- cancelled 2000-08-06 05:29Z (archive)
- cancels
- HYDROLANT 2712/00
- authority
- NAVAREA V 1717/00 050211Z AUG 00
- sea
- North Atlantic Ocean
- position
- 3.500, -46.764
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 07 AUG BY M/V MEZEN TOWING 8000 METER LONG CABLE IN AREA BOUND BY 02-30N 047-15W, 03-30N 047-15W, 04-30N 046-30W, 03-30N 046-10W. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 2712/00. 3. CANCEL THIS MSG 08 AUG.
This area · cable & pipeline work
330 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until further notice in area bound by 05-38.66N 047-18.27W, 06-36.00N…2020-01-29
- Cable operations in progress until further notice by M/V lida along trackline joining 04-40.14N 046-13.93W,…2020-01-20
- Cable operations 24 and 25 jan by by M/V lida along trackline joining 04-40.14N 046-13.93W, 05-38.66N…2020-01-20
- Seismic survey in progress until 10 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…2016-05-06
- Seismic survey in progress until 07 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…2016-05-04
- Seismic survey in progress until 04 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…2016-05-01
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 05 aug by M/V mezen towing 8000 meter long cable in area bound by 01-30N…cancels · 2000-08-03
- Seismic survey in progress until 05 aug by M/V mezen towing 8000 meter long cable in area bound by 01-30N…replaced · 2000-08-03
- Seismic survey in progress until 09 aug by M/V mezen towing 8000 meter long cable in area between 02-30N…cancelled by · 2000-08-06
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.