Cable ops
Seismic survey in progress until 07 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…
Brazil-north Coast · HYDROLANT 1056/16
- issued
- 2016-05-04 01:19Z
- status
- cancelled 2016-05-08 00:01Z (archive)
- cancels
- HYDROLANT 1042/16
- authority
- NAVAREA V N 389/16 040028Z MAY 16.
- position
- 3.074, -46.412
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-NORTH COAST. DNC 01. 1. SEISMIC SURVEY IN PROGRESS UNTIL 07 MAY BY M/V BGP CHALLENGER AND M/V SEA MOBY DICK TOWING 12000 METER LONG CABLE IN AREA BOUND BY 03-03.26N 045-49.49W, 02-10.46N 047-20.22W, 03-59.57N 046-04.37W 2. CANCEL HYDROLANT 1042/16. 3. CANCEL THIS MSG 08 MAY 16.
This area · cable & pipeline work
296 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until further notice by M/V lida along trackline joining 04-40.14N 046-13.93W,…2020-01-20
- Cable operations 24 and 25 jan by by M/V lida along trackline joining 04-40.14N 046-13.93W, 05-38.66N…2020-01-20
- Seismic survey in progress until 10 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…2016-05-06
- Seismic survey in progress until 04 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…2016-05-01
- Seismic survey in progress until 01 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…2016-04-29
- Seismic survey in progress until 01 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…2016-04-27
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 04 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…cancels · 2016-05-01
- Seismic survey in progress until 04 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…replaced · 2016-05-01
- Seismic survey in progress until 10 may by M/V bgp challenger and M/V sea moby dick towing 12000 meter long…cancelled by · 2016-05-06
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.