Cable ops
Seismic survey by M/V ramform valiant towing ten 9000 meter long cables: a. 01, 02 and 06 apr in area bound…
Brazil-east Coast · HYDROLANT 564/11
- issued
- 2011-04-04 01:06Z
- status
- cancelled 2011-04-07 00:01Z (archive)
- cancels
- HYDROLANT 548/11
- authority
- NAVAREA V E 260/11 040032Z APR 11.
- sea
- South Atlantic Ocean
- position
- -13.959, -37.681
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-EAST COAST.
1. SEISMIC SURVEY BY M/V RAMFORM VALIANT
TOWING TEN 9000 METER LONG CABLES:
A. 01, 02 AND 06 APR IN AREA BOUND BY
14-03.23S 038-06.47W, 13-31.57S 037-36.35W,
14-09.07S 036-56.32W, 14-40.57S 037-24.83W.
B. 03 THRU 05 APR IN AREA BOUND BY
13-03.12S 038-15.82W, 13-07.45S 038-24.70W,
13-13.33S 038-32.58W, 13-15.00S 038-33.12W,
13-27.45S 038-42.25W, 13-34.87S 038-39.85W,
13-19.73S 038-08.90W, 13-05.37S 038-13.10W.
SIX MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 548/11.
3. CANCEL THIS MSG 07 APR.
This area · cable & pipeline work
290 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
- Cable repair operations 23 feb thru 25 mar by M/V teneo vicinity of trackline joining 13-00.42S 038-27.59W,…2015-02-23
- Seismic survey 04 apr thru 25 may by M/V l'atalante towing 4850 meter long cable in area bound by 09-06.00S…2014-04-10
- Seismic survey in progress until 10 aug by M/V ocean endeavour towing 12 five mile long cables in area bound…2014-02-25
- Cable laying operations 020100Z to 061100Z aug along trackline between 11-47.59S 037-22.28W and 11-47.29S…2013-07-31
- Cable laying operations 14 thru 24 feb by cableship ile de batz along trackline between 13-00.81S 038-27.13W…2013-02-13
- Seismic survey in progress until 24 oct by M/V harrier explorer towing 6.5 mile long cables in area bound by…2012-10-22
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.