Cable ops
Seismic survey in progress until 10 apr M/V tropicaliente towing two 20 meter long cables and M/V bulldog…
HYDROLANT 586/04
- issued
- 2004-04-08 08:20Z
- status
- cancelled 2004-04-11 00:00Z (archive)
- authority
- NAVAREA V 311/04 080403Z APR 04
- sea
- South Atlantic Ocean
- position
- -13.828, -38.920
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 10 APR M/V TROPICALIENTE TOWING TWO 20 METER LONG CABLES AND M/V BULLDOG TOWING TWO 15 METER LONG CABLES IN AREA BOUND BY 13-48.3S 038-57.5W, 13-50.6S 038-52.7W, 13-51.0S 038-52.9W, 13-48.7S 038-57.7W. ONE MILE BERTH REQUESTED. 2. CANCEL THIS MSG 11 APR.
This area · cable & pipeline work
215 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
- Cable repair operations 23 feb thru 25 mar by M/V teneo vicinity of trackline joining 13-00.42S 038-27.59W,…2015-02-23
- Seismic survey 04 apr thru 25 may by M/V l'atalante towing 4850 meter long cable in area bound by 09-06.00S…2014-04-10
- Seismic survey in progress until 10 aug by M/V ocean endeavour towing 12 five mile long cables in area bound…2014-02-25
- Cable laying operations 020100Z to 061100Z aug along trackline between 11-47.59S 037-22.28W and 11-47.29S…2013-07-31
- Cable laying operations 14 thru 24 feb by cableship ile de batz along trackline between 13-00.81S 038-27.13W…2013-02-13
- Seismic survey in progress until 24 oct by M/V harrier explorer towing 6.5 mile long cables in area bound by…2012-10-22
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.