Cable ops
Seismic survey 080300Z to 140259Z jul by M/V western neptune towing 12 3.5 mile long cables in area bound by…
HYDROLANT 1259/09
- issued
- 2009-07-08 00:53Z
- status
- cancelled 2009-07-14 03:59Z (archive)
- self-cancels
- 2009-07-14 03:59Z
- authority
- NAVAREA V E 1418/09 080032Z JUL 09.
- sea
- South Atlantic Ocean
- position
- -22.679, -40.239
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY 080300Z TO 140259Z JUL BY M/V WESTERN NEPTUNE TOWING 12 3.5 MILE LONG CABLES IN AREA BOUND BY 22-28S 040-26W, 22-35S 040-32W, 22-51S 040-08W, 22-49S 039-53W. SIX MILE BERTH REQUESTED. 2. CANCEL THIS MSG 140359Z JUL.
Activity windows · 1 in this warning
| opens (UTC) | closes (UTC) | local | length |
|---|---|---|---|
| 2009-07-08 03:00Z | 2009-07-14 02:59Z | — | 143 h 59 |
Parsed from the warning text; outside these windows the area is normally not active, but the warning stays in force until cancelled.
This area · cable & pipeline work
1861 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
24
- Cable operations in progress until 03 feb 25 by cableship bold maverick in: a. 22-11.33S 041-06.38W2024-09-05
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by oceanic champion towing 12 8000 meter cables in area bound by 25-33.47S…2017-01-10
- Seismic survey in progress until 14 jan by oceanic champion towing 12 8000 meter cables in area bound by…2017-01-07
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 17.2 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 20.8 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 27 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 28.6 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 47.6 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 53.7 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 54.4 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 59.2 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 59.8 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 71.9 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 91.4 nm
Worldwide now
41 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.