Cable ops
Pipeline operations in progress until 160400Z dec within 0.5 miles of 03-40.11S 038-27.67W
Brazil-north Coast · HYDROLANT 1936/14
- issued
- 2014-08-14 01:10Z
- status
- cancelled 2014-12-16 05:00Z (archive)
- self-cancels
- 2014-12-16 05:00Z
- authority
- NAVAREA V N 888/14 132359Z AUG 14.
- sea
- South Atlantic Ocean
- position
- -3.668, -38.461 · r 0.5 nm
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-NORTH COAST. 1. PIPELINE OPERATIONS IN PROGRESS UNTIL 160400Z DEC WITHIN 0.5 MILES OF 03-40.11S 038-27.67W. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 160500Z DEC 14.
This area · cable & pipeline work
356 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-10-10
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 1400 meter long cables in area…2015-09-16
- Seismic survey in progress until 10 feb 16 by M/V ramform atlas towing 14 9000 meter long cables in area…2015-09-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
41 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.