Cable ops
Seismic survey in progress until 31 oct by M/V ramform viking towing ten 4500 meter long cables in area…
HYDROLANT 2138/99
- issued
- 1999-10-07 07:10Z
- status
- cancelled 1999-11-01 06:00Z (archive)
- authority
- NAVAREA V 819/99 070300Z OCT 99 AOR-E EGC #037
- sea
- South Atlantic Ocean
- position
- -22.716, -40.233
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 31 OCT BY M/V RAMFORM VIKING TOWING TEN 4500 METER LONG CABLES IN AREA BOUND BY 22-25S 040-17W, 22-45S 040-35W, 23-02S 040-08W, 22-38S 039-55W. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 01 NOV.
This area · cable & pipeline work
1871 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
24
- Cable operations in progress until 03 feb 25 by cableship bold maverick in: a. 22-11.33S 041-06.38W2024-09-05
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by oceanic champion towing 12 8000 meter cables in area bound by 25-33.47S…2017-01-10
- Seismic survey in progress until 14 jan by oceanic champion towing 12 8000 meter cables in area bound by…2017-01-07
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 19.2 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 22.9 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 27.3 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 28.9 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 47.5 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 55.7 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 56.5 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 60.9 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 61.8 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 74.1 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 93.5 nm
Worldwide now
41 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.