Cable ops
Seismic survey in progress until 040300Z feb by M/V ocean surveyor towing 84 meter long cable in area bound…
HYDROLANT 237/05
- issued
- 2005-02-02 14:48Z
- status
- cancelled 2005-02-04 04:00Z (archive)
- self-cancels
- 2005-02-04 04:00Z
- cancels
- HYDROLANT 218/05
- authority
- NAVAREA V 97/05 021526Z FEB 05.
- sea
- South Atlantic Ocean
- position
- -10.981, -36.996
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 040300Z FEB BY M/V OCEAN SURVEYOR TOWING 84 METER LONG CABLE IN AREA BOUND BY 10-57.3S 036-56.4W 10-57.6S 036-55.4W 11-00.6S 037-03.4W 10-59.4S 037-02.9W. FOUR MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 218/05. 3. CANCEL THIS MSG 040400Z FEB.
This area · cable & pipeline work
218 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
- Cable repair operations 23 feb thru 25 mar by M/V teneo vicinity of trackline joining 13-00.42S 038-27.59W,…2015-02-23
- Seismic survey in progress until 30 oct by M/V ramform viking towing 12 9500 meter long cables in area bound…2014-09-24
- Seismic survey in progress until 30 oct by M/V ramform viking towing 12 9500 meter long cables in area bound…2014-09-18
- Seismic survey in progress until 30 oct by M/V ramform viking towing 12 9500 meter long cables in area bound…2014-09-17
- Seismic survey 04 apr thru 25 may by M/V l'atalante towing 4850 meter long cable in area bound by 09-06.00S…2014-04-10
- Cable laying operations 020100Z to 061100Z aug along trackline between 11-47.59S 037-22.28W and 11-47.29S…2013-07-31
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Cable operations 310300Z jan to 030300Z feb by cableship ocean surveyor towing 84 meter long cable in area…cancels · 2005-01-30
- Cable operations 310300Z jan to 030300Z feb by cableship ocean surveyor towing 84 meter long cable in area…replaced · 2005-01-30
- Seismic survey in progress until 050300Z feb by M/V ocean surveyor towing 84 meter long cable in area bound…cancelled by · 2005-02-04
Nearby now · within 120 nm
- Maceio light 09-41.03S 035-43.38W unlit until 31 octNav aids · 108.3 nm
Worldwide now
41 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.