Cable ops
Seismic survey in progress until 03 feb by M/V geco diamond towing eight 6000 meter long cables in area…
HYDROLANT 395/00
- issued
- 2000-02-02 08:50Z
- status
- cancelled 2000-02-04 06:00Z (archive)
- authority
- NAVAREA V 239/00 020542Z FEB 00
- sea
- South Atlantic Ocean
- position
- -24.660, -42.288
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 03 FEB BY M/V GECO DIAMOND TOWING EIGHT 6000 METER LONG CABLES IN AREA BOUND BY 24-00S 041-47W, 24-35S 042-30W, 24-20S 041-30W, 24-48S 042-30W. 3.5 MILE BERTH REQUESTED. 2. CANCEL THIS MSG 04 FEB.
This area · cable & pipeline work
2232 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
23
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic survey in progress until 09 oct by M/V sw diamond towing nine 225 meter long cables in area bound by…2022-10-07
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Underwater operations in progress until 132300Z jul by cableship ile de brehat in: a. 24-03.8S 046-29.2W2017-06-15
- Seismic survey 21 thru 28 jan by M/V polarcus adira towing 9000 meter long cable in area bound by 25-06S…2017-01-19
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Worldwide now
41 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.