Cable ops
Seismic survey in progress until 20 mar by M/V ramform valiant towing ten 8100 meter long cables in area…
HYDROLANT 513/09
- issued
- 2009-03-14 01:32Z
- status
- cancelled 2009-03-18 01:23Z (archive)
- cancels
- HYDROLANT 480/09
- authority
- NAVAREA V S 560/09 140113Z MAR.
- sea
- South Atlantic Ocean
- position
- -26.549, -46.715
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 20 MAR BY M/V RAMFORM VALIANT TOWING TEN 8100 METER LONG CABLES IN AREA BOUND BY 27-12.42S 046-33.47W, 27-12.17S 046-53.45W, 25-53.27S 046-52.17W, 25-53.50S 046-32.42W. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 480/09. 3. CANCEL THIS MSG 21 MAR.
This area · cable & pipeline work
739 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations in progress until 30 mar 24 by cableship durable in: a. 24-05.68S 046-30.76W2023-12-27
- Cable operations in progress until 241100Z feb 21 by cableship peter faber and cableship recorder in: a.…2020-11-26
- Cable operations in progress until 251100Z nov by cableship peter faber and cableship recorder in: a.…2020-09-30
- Underwater operations 15 aug thru 21 sep by cableship peter faber and cableship recorder in: a. 35-38.11S…2020-08-14
- Underwater operations in progress until 20 sep by cableship peter faber and cableship recorder in: a.…2020-08-05
- Underwater operations in progress until 142359Z aug by cableship ile de brehat in: a. 24-03.0S 046-31.4W2017-07-14
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey 100300Z to 200259Z mar by M/V ramform valiant towing ten 8100 meter long cables in area bound…cancels · 2009-03-10
- Seismic survey 100300Z to 200259Z mar by M/V ramform valiant towing ten 8100 meter long cables in area bound…replaced · 2009-03-10
- Seismic survey in progress until 20 mar by M/V ramform valiant towing ten 8100 meter long cables in area…cancelled by · 2009-03-18
Nearby now · within 120 nm
- Scientific bouy, yellow, fl y 20 sec established in 27-24.38S 047-15.92WSurveys · 59.3 nm
- Ponta da galheta light 27-34.55S 048-24.99W unlit until 31 augNav aids · 109.9 nm
Worldwide now
41 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.