Cable ops
Seismic survey in progress until 010159Z mar by M/V sanco swift towing 12 five mile long cables in area…
Brazil-southeast Coast · HYDROLANT 553/14
- issued
- 2014-02-22 02:14Z
- status
- cancelled 2014-03-01 02:59Z (archive)
- self-cancels
- 2014-03-01 02:59Z
- authority
- NAVAREA V S 195/14 220030Z FEB 14.
- sea
- South Atlantic Ocean
- position
- -22.878, -39.388
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-SOUTHEAST COAST. 1. SEISMIC SURVEY IN PROGRESS UNTIL 010159Z MAR BY M/V SANCO SWIFT TOWING 12 FIVE MILE LONG CABLES IN AREA BOUND BY 23-04.22S 038-49.65W, 23-18.95S 039-01.03W, 22-41.40S 039-56.95W, 22-26.38S 039-45.07W. SIX MILE BERTH REQUESTED. 2. CANCEL THIS MSG 010259Z MAR 14.
This area · cable & pipeline work
1598 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
24
- Cable operations in progress until 03 feb 25 by cableship bold maverick in: a. 22-11.33S 041-06.38W2024-09-05
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic survey in progress until 14 jan by oceanic champion towing 12 8000 meter cables in area bound by…2017-01-07
- Seismic survey 31 dec thru 07 jan 17 by M/V oceanic champion towing 12 7408 meter long cables in area bound…2016-12-30
- Seismic survey in progress until 15 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-08
- Seismic survey in progress until 08 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-01
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 22.4 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 50.6 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 62.7 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 64.5 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 93.8 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 95.7 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 96.5 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 100.8 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 105.1 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 108.2 nm
Worldwide now
41 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.