Cable ops
Seismic survey in progress until 05 mar by M/V geco tau towing 8334 meter long cable in area bound by 22-26S…
HYDROLANT 789/00
- issued
- 2000-03-03 07:30Z
- status
- cancelled 2000-03-06 06:00Z (archive)
- authority
- NAVAREA V 514/00 030539Z MAR 00
- sea
- South Atlantic Ocean
- position
- -23.187, -40.705
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 05 MAR BY M/V GECO TAU TOWING 8334 METER LONG CABLE IN AREA BOUND BY 22-26S 041-10W, 23-00S 041-35W, 24-00S 041-00W, 23-10S 039-28W. FIVE MILE BERTH REQUESTED. 2. CANCEL THIS MSG 06 MAR.
This area · cable & pipeline work
2089 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
24
- Cable operations in progress until 03 feb 25 by cableship bold maverick in: a. 22-11.33S 041-06.38W2024-09-05
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by oceanic champion towing 12 8000 meter cables in area bound by 25-33.47S…2017-01-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 29.9 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 47.3 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 51.3 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 52.9 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 66.5 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 71.4 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 73.9 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 76.7 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 81.3 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 97.1 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 113.4 nm
- Hazardous operations 0800Z to 2100Z daily 18 thru 20 aug in area within ten miles of 25-06.00S 041-13.00WExercises · 118.2 nm
Worldwide now
41 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.