Cable ops
Seismic survey operations 03 apr thru 20 may by M/V geo natuna towing six 4000 meter long cables in area…
HYDROPAC 666/09
- issued
- 2009-04-02 13:59Z
- status
- cancelled 2009-05-21 00:01Z (archive)
- authority
- NAVAREA VIII 164/09 021004Z APR 09.
- sea
- Arabian Sea
- position
- 18.499, 72.532
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY OPERATIONS 03 APR THRU 20 MAY BY M/V GEO NATUNA TOWING SIX 4000 METER LONG CABLES IN AREA BOUND BY 18-36.73N 072-17.10E, 18-42.57N 072-40.23E, 18-23.20N 072-46.62E, 18-17.20N 072-23.72E. SIX MILE BERTH REQUESTED. 2. CANCEL THIS MSG 21 MAY.
This area · cable & pipeline work
393 within 180 nm since 1999 · 28 in the last 12 months · 0 in force now
99
00
05
10
15
20
25
26
- Cable operations 18 thru 27 apr by cableship athba in area bound by 19-07.04N 070-09.01E, 19-05.71N…2026-04-17
- Pipeline operations 20 apr thru 19 may by barge km 180, M/V dhp shivalik, tug shivali II, M/V nand sarathi…2026-04-17
- Pipeline operations 18 apr thru 15 may by M/V posh panglima, M/V posh natuna and posh arcturus in vicinity…2026-04-15
- Pipeline operations 16 apr thru 15 may by M/V WILCHIEF1 in area bound by 20-28.83N 071-13.96E, 20-27.49N…2026-04-15
- Pipeline operations 15 apr thru 13 may 26 by tug marigold and barge aqua float in areas bound by: a.…2026-04-13
- Pipeline operations 13 apr thru 12 may 26 by M/V fugro mapper in areas bound by: a. 20-27.62N 072-27.79E,…2026-04-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Worldwide now
41 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.