merchant vessel · named in official warnings

C/S Cable Retriever

5 messages · 2007-12-02 to 2019-04-01

status
no warning in force
first mention
2007-12-02 09:16Z
latest mention
2019-04-01 23:56Z
reported as
Cable ops5
seas
Philippine SeaSouth China SeaSulu Sea
last position
11.468, 120.508

Track · one row per mention

mentions
5
span
4,138 d
in force
88 d
along track
2,000.5 nm
first → last
715 nm
issuedtypewherepositionstatus
2007-12-02Cable opsPhilippine Sea23.20, 122.70→ 2007-12-15
2008-03-07Cable opsSouth China Sea20.54, 115.01→ 2008-03-09
2008-03-22Cable opsPhilippine Sea22.73, 123.45→ 2008-04-01
2008-11-23Cable opsSouth China Sea25.23, 120.29→ 2009-01-01
2019-04-01Cable opsSulu Sea · Philippines11.47, 120.51→ 2019-04-28

Messages · 5, oldest first

  1. 1
    Cable ops·HYDROPAC 2137/072007-12-02 09:16Z → cancelled 2007-12-15 15:56Z
    Cable repair operations 03 thru 22 dec by M/V cable retriever vicinity 23-12N 122-42E
    Philippine Sea
    1. CABLE REPAIR OPERATIONS 03 THRU 22 DEC
       BY M/V CABLE RETRIEVER VICINITY
       23-12N 122-42E.
    2. CANCEL THIS MSG 23 DEC.
    
  2. 2
    Cable ops·HYDROPAC 443/082008-03-07 04:26Z → cancelled 2008-03-09 15:19Z
    Cable repair operations in progress until 15 mar by M/V cable retriever vicinity of trackline between…
    South China Sea
    1. CABLE REPAIR OPERATIONS IN PROGRESS UNTIL 15 MAR
       BY M/V CABLE RETRIEVER VICINITY OF TRACKLINE BETWEEN
       20-34.50N 114-58.50E AND 20-30.00N 115-03.07E.
    2. CANCEL THIS MSG 16 MAR.
    
  3. 3
    Cable ops·HYDROPAC 523/082008-03-22 15:54Z → cancelled 2008-04-01 09:05Z
    Cable repair operations 27 mar thru 04 apr, alternate 05 thru 12 apr by M/V cable retriever vicinity of…
    Philippine Sea
    1. CABLE REPAIR OPERATIONS 27 MAR THRU 04 APR,
       ALTERNATE 05 THRU 12 APR BY
       M/V CABLE RETRIEVER VICINITY OF TRACKLINE
       JOINING 22-56N 123-47E, 22-42N 123-28E,
       22-36N 123-05E.
    2. CANCEL THIS MSG 13 APR.
    
  4. 4
    Cable ops·HYDROPAC 2300/082008-11-23 10:07Z → cancelled 2009-01-01 00:00Z
    Cable repair operations in progress until 31 dec by M/V cable retriever along tracklines between: a.…
    South China Sea
    1. CABLE REPAIR OPERATIONS IN PROGRESS UNTIL 31 DEC
       BY M/V CABLE RETRIEVER ALONG TRACKLINES BETWEEN:
       A. 26-20.3N 120-23.2E AND 26-23.3N 120-26.0E.
       B. 24-25.2N 120-15.3E AND 24-25.2N 120-09.6E.
    2. CANCEL THIS MSG 01 JAN 09.
    
  5. 5
    Cable ops·HYDROPAC 1103/192019-04-01 23:56Z → cancelled 2019-04-28 00:01Z
    Cable operations in progress until 27 apr by c/s cable retriever in vicinity of trackline joining 11-30.2N…
    Sulu Sea · Philippines · Sulu Sea
    SULU SEA.
    PHILIPPINES.
    DNC 11.
    1. CABLE OPERATIONS IN PROGRESS UNTIL 27 APR BY
       C/S CABLE RETRIEVER IN VICINITY OF TRACKLINE
       JOINING
       11-30.2N 120-31.8E, 11-26.0N 120-29.2E.
       WIDE BERTH REQUESTED.
    2. CANCEL THIS MSG 28 APR 19.
    

Not for navigation. The name is read automatically from official navigational warnings; a common name can belong to more than one ship, and a message may describe work the vessel is doing (cable, survey) rather than something that happened to it. Mariners must use official NAVAREA broadcasts and their national MSI service.

C/S Cable Retriever — navigational warnings · seahazards