merchant vessel · named in official warnings
M/V Miclyn Endurance
5 messages · 2010-11-19 to 2018-03-07
- status
- no warning in force
- first mention
- 2010-11-19 05:52Z
- latest mention
- 2018-03-07 23:50Z
- reported as
- Cable ops4Surveys1
- seas
- Indian OceanBay of Bengal
- last position
- 16.473, 82.703
Track · one row per mention
- mentions
- 5
- span
- 2,665 d
- in force
- 203 d
- along track
- 2,999.4 nm
- first → last
- 2,989.3 nm
| issued | type | where | position | status |
|---|---|---|---|---|
| 2010-11-19 | Surveys | Australia-southeast Coast · Bass Strait | — | → 2011-04-02 |
| 2016-01-03 | Cable ops | Australia-northwest Coast | -20.97, 115.60 | → 2016-01-04 |
| 2016-01-13 | Cable ops | Eastern Indian Ocean · Australia-northwest Coast | — | → 2016-02-22 |
| 2018-02-28 | Cable ops | Bay of Bengal · India | 16.32, 82.57 | → 2018-03-07 |
| 2018-03-07 | Cable ops | Bay of Bengal · India | 16.47, 82.70 | → 2018-03-29 |
Messages · 5, oldest first
- 1Surveys·HYDROPAC 2502/102010-11-19 05:52Z → cancelled 2011-04-02 09:37ZUnderwater operations in progress until further notice by M/V miclyn endurance and M/V DB30 in area between…Australia-southeast Coast · Bass Strait
AUSTRALIA-SOUTHEAST COAST. BASS STRAIT. UNDERWATER OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY M/V MICLYN ENDURANCE AND M/V DB30 IN AREA BETWEEN 38-11.0S 38-14.5S AND 148-00.5E 148-36.0E. TWO MILE BERTH REQUESTED.
- 2Cable ops·HYDROPAC 11/162016-01-03 08:50Z → cancelled 2016-01-04 13:15ZCable laying operations in progress until further notice by M/V miclyn endurance along trackline between…Australia-northwest Coast · Indian Ocean
AUSTRALIA-NORTHWEST COAST. DNC 04. 1. CABLE LAYING OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY M/V MICLYN ENDURANCE ALONG TRACKLINE BETWEEN 21-01.6S 115-34.1E AND 20-54.9S 115-37.4E. 2.5 MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 4193/15(22).
- 3Cable ops·HYDROPAC 92/162016-01-13 00:20Z → cancelled 2016-02-22 02:18ZCable laying operations in progress until further notice by M/V miclyn endurance in area between 20-01.6S…Eastern Indian Ocean · Australia-northwest Coast
EASTERN INDIAN OCEAN. AUSTRALIA-NORTHWEST COAST. DNC 04. CABLE LAYING OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY M/V MICLYN ENDURANCE IN AREA BETWEEN 20-01.6S 20-57.5S AND 115-35.0E 116-18.0E. 2.5 MILE BERTH REQUESTED.
- 4Cable ops·HYDROPAC 794/182018-02-28 16:26Z → cancelled 2018-03-07 23:50ZPipeline operations in progress until 19 mar by M/V miclyn endurance with submersible in area bound by…Bay of Bengal · India · Bay of Bengal
BAY OF BENGAL. INDIA. DNC 03. 1. PIPELINE OPERATIONS IN PROGRESS UNTIL 19 MAR BY M/V MICLYN ENDURANCE WITH SUBMERSIBLE IN AREA BOUND BY 16-31.7N 082-29.9E, 16-32.8N 082-31.8E, 16-39.7N 082-27.1E, 16-39.8N 082-27.6E, 16-37.1N 082-29.5E, 16-37.9N 082-30.2E, 16-31.8N 082-35.5E, 16-16.5N 082-35.9E, 16-16.5N 082-42.5E, 16-08.2N 082-42.5E, 16-08.3N 082-29.9E, 16-31.7N 082-29.9E. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 20 MAR 18.
- 5Cable ops·HYDROPAC 902/182018-03-07 23:50Z → cancelled 2018-03-29 00:01ZPipeline operations in progress until 28 mar by M/V miclyn endurance with submersible in area bound by…Bay of Bengal · India · Bay of Bengal
BAY OF BENGAL. INDIA. DNC 03. 1. PIPELINE OPERATIONS IN PROGRESS UNTIL 28 MAR BY M/V MICLYN ENDURANCE WITH SUBMERSIBLE IN AREA BOUND BY 16-32.30N 082-35.05E, 16-36.20N 082-39.64E, 16-36.13N 082-48.47E, 16-20.91N 082-48.33E, 16-21.01N 082-35.85E, 16-31.76N 082-35.52E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 794/18. 3. CANCEL THIS MSG 29 MAR 18.
Not for navigation. The name is read automatically from official navigational warnings; a common name can belong to more than one ship, and a message may describe work the vessel is doing (cable, survey) rather than something that happened to it. Mariners must use official NAVAREA broadcasts and their national MSI service.