merchant vessel · named in official warnings
M/V SEA Challenger
5 messages · 1998-12-04 to 1999-03-03
- status
- no warning in force
- first mention
- 1998-12-04 21:17Z
- latest mention
- 1999-03-03 06:15Z
- reported as
- Cable ops5
Track · one row per mention
- mentions
- 5
- span
- 88 d
- in force
- 191 d
- along track
- —
- first → last
- —
| issued | type | where | position | status |
|---|---|---|---|---|
| 1998-12-04 | Cable ops | — | — | → 1999-01-04 |
| 1999-01-08 | Cable ops | — | — | → 1999-01-14 |
| 1999-01-22 | Cable ops | — | — | → 1999-02-22 |
| 1999-02-28 | Cable ops | — | — | → 1999-03-03 |
| 1999-03-03 | Cable ops | — | — | → 1999-07-06 |
Messages · 5, oldest first
- 1Cable ops·HYDROPAC 937/981998-12-04 21:17Z → cancelled 1999-01-04 00:00ZSeismic survey in progress until further notice by M/V sea challenger towing two mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V SEA CHALLENGER TOWING TWO MILE LONG CABLE IN AREA BETWEEN 32-52S 35-40S AND 129-21E 135-46E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 872/98.
- 2Cable ops·HYDROPAC 24/991999-01-08 20:45Z → cancelled 1999-01-14 00:00ZSeismic survey in progress until further notice by M/V sea challenger towing two mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V SEA CHALLENGER TOWING TWO MILE LONG CABLE IN AREA BETWEEN 34-40S 36-00S AND 133-00E 135-00E. WIDE BERTH REQUESTED.
- 3Cable ops·HYDROPAC 66/991999-01-22 14:25Z → cancelled 1999-02-22 00:00ZSeismic survey in progress until further notice by M/V sea challenger towing two mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V SEA CHALLENGER TOWING TWO MILE LONG CABLE IN AREA BETWEEN 32-20S 34-00S AND 129-00E 132-00E. WIDE BERTH REQUESTED.
- 4Cable ops·HYDROPAC 159/991999-02-28 16:25Z → cancelled 1999-03-03 00:00ZSeismic survey in progress until further notice by M/V sea challenger towing 1.5 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V SEA CHALLENGER TOWING 1.5 MILE LONG CABLE IN AREA BETWEEN 37-53S 38-10S AND 148-55E 149-40E.
- 5Cable ops·HYDROPAC 170/991999-03-03 06:15Z → cancelled 1999-07-06 05:20ZSeismic survey in progress until further notice by M/V sea challenger towing 2.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V SEA CHALLENGER TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 38-15S 39-16S AND 148-45E 149-30E. 2. CANCEL HYDROPAC 159/99.
Not for navigation. The name is read automatically from official navigational warnings; a common name can belong to more than one ship, and a message may describe work the vessel is doing (cable, survey) rather than something that happened to it. Mariners must use official NAVAREA broadcasts and their national MSI service.