South Atlantic Ocean
IHO sea area 32 · -70° to 20° E, -60° to 0° N
- in force
- 21
- last 12 months
- 120
- since 1975
- 17,965
- categories
- 21
In force now · 21
- NAVAREA 7 251/26 · Other2026-09-04As of 4 September 2026, mining and exploration vessels are operating off Orange River Mouth, Namibia; keep 2 nautical miles clear until further notice.
- NAVAREA 7 246/26 · Cable ops2026-08-24On 24 Aug 2026, seismic survey vessel Ramform Victory is towing 12 cables in the South Atlantic near Orange River mouth; wide berth requested.
- HYDROLANT 1462/26 · Exercises2026-07-29Hazardous operations are occurring off Brazil in a bounded area from August 3 through September 11.
- HYDROLANT 1457/26 · Exercises2026-07-29Hazardous operations are in progress in the South Atlantic until 060400Z June 27 near 24-39S 042-30W; two-mile berth requested.
- NAVAREA 7 221/26 · Other2026-07-29A special buoy with a yellow occulting light is spotted at 28-35.8S 013-54.7E off Oranjemund, South Atlantic; caution advised.
- NAVAREA II 269/26 · Cable ops2026-07-02Seismic survey by vessel Ramform Victory is in progress off Pointe Noire until further notice; wide berth requested.
- HYDROLANT 1258/26 · Nav aids2026-06-27An ocean data buoy is temporarily established in the South Atlantic off Brazil at 32-14.29S 051-58.16W, with cancellation December 26.
- HYDROLANT 1160/26 · Surveys2026-06-17Underwater operations by vessel Fugro Vaquita are in progress until 140001Z November, with wide berth requested; cancels HYDROLANT 1157/26.
- HYDROLANT 942/26 · Nav aids2026-05-13An ocean data acquisition buoy is established at 05-09.46S 035-09.81W in the South Atlantic off Brazil; this message cancels at 080001Z Nov 26.
- HYDROLANT 906/26 · Nav aids2026-05-08An ODAS buoy Bravo RN-L is temporarily established in the South Atlantic off Brazil at 04-53.00S 035-46.01W until 20 October.
- HYDROLANT 900/26 · Nav aids2026-05-07Tamandare Light in Brazil is unlit until November 2.
- HYDROLANT 882/26 · Nav aids2026-05-04Maceio light, 09-41.03S 035-43.38W, is unlit until 31 October; cancellation at 010001Z November 26.
- HYDROLANT 810/26 · Nav aids2026-04-23A yellow data buoy is established in the South Atlantic off Brazil at 17-58.12S 038-41.48W until October 19; message cancels October 26.
- HYDROLANT 657/26 · Nav aids2026-04-02Radar beacon at Cabo Sao Tome light is off air until 28 Sep.
- HYDROLANT 638/26 · Nav aids2026-03-31Ponta dos Meros light at 23-13.57S 044-20.83W is unlit until 26 September; cancel advisories.
- HYDROLANT 628/26 · Nav aids2026-03-30An ODAS buoy is established at 24-06.36S 045-38.78W; this message cancels 250001Z September 2026.
- HYDROLANT 627/26 · Nav aids2026-03-30Light at Laje da Conceicao, 24-14.18S 046-41.46W, is unlit until 24 September.
- HYDROLANT 582/26 · Wrecks2026-03-23Foul ground exists in a bounded area off Brazil until December 6, 2027.
- HYDROLANT 2010/25 · Surveys2025-11-28Underwater survey operations by vessel Fugro Vaquita off Brazil daily from 10:00 to 20:00 UTC until November 2, 2026; wide berth requested.
- HYDROLANT 1213/25 · Wrecks2025-07-19Depths are less than charted in three areas off Brazil in the South Atlantic.
- HYDROLANT 915/25 · Wrecks2025-05-31A reported depth of 18.3 meters at 20-35.71S 034-46.07W in the Western South Atlantic; previous warning cancelled.
Longest in force
- HYDROLANT 915/25 · Wrecks2025-05-31A reported depth of 18.3 meters at 20-35.71S 034-46.07W in the Western South Atlantic; previous warning cancelled.
- HYDROLANT 1213/25 · Wrecks2025-07-19Depths are less than charted in three areas off Brazil in the South Atlantic.
- HYDROLANT 2010/25 · Surveys2025-11-28Underwater survey operations by vessel Fugro Vaquita off Brazil daily from 10:00 to 20:00 UTC until November 2, 2026; wide berth requested.
- HYDROLANT 582/26 · Wrecks2026-03-23Foul ground exists in a bounded area off Brazil until December 6, 2027.
- HYDROLANT 627/26 · Nav aids2026-03-30Light at Laje da Conceicao, 24-14.18S 046-41.46W, is unlit until 24 September.
By year
75
78
97
98
99
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
By month (all years)
J
F
M
A
M
J
J
A
S
O
N
D
By category · since 1997
| Cable ops | 5,172 | 29% |
| Icebergs | 3,054 | 17% |
| Surveys | 2,309 | 13% |
| Nav aids | 1,963 | 11% |
| Exercises | 1,951 | 11% |
| Incidents | 1,590 | 9% |
| Quakes | 583 | 3% |
| Derelicts | 468 | 3% |
| Other | 269 | 1% |
| Missiles | 197 | 1% |
| Wrecks | 135 | 1% |
| Debris | 73 | 0% |
| Restricted | 66 | 0% |
| Structures | 60 | 0% |
| Containers | 38 | 0% |
| Piracy | 13 | 0% |
| Towing | 12 | 0% |
| Spills | 5 | 0% |
| Mines | 5 | 0% |
| Ordnance | 1 | 0% |
| War risk | 1 | 0% |
Archive · 17,944 cancelled
- HYDROLANT 808/02 · Cable ops2002-04-09 → 2002-04-10Seismic survey in progress until 100259Z apr by M/V veritas viking II towing six 6500 meter long cables in…
- HYDROLANT 807/02 · Cable ops2002-04-09 → 2002-04-10Seismic survey in progress until 100300Z apr by M/V ramform explorer towing eight 6852 meter long cables in…
- HYDROPAC 651/02 · Derelicts2002-04-07 → 2002-04-14Derelict M/V rita adrift in 16-10.1S 010-37.7E
- HYDROLANT 784/02 · Cable ops2002-04-06 → 2002-04-10Seismic survey in progress until 09 apr by M/V ramform victory towing eight 6600 meter long cables in area…
- HYDROLANT 775/02 · Cable ops2002-04-05 → 2002-04-09Seismic survey in progress until 090300Z apr by M/V cgg harmattan towing eight 6000 meter long cables in…
- HYDROLANT 767/02 · Cable ops2002-04-04 → 2002-04-07Seismic survey in progress until 070300Z apr by M/V ramform explorer towing eight 6852 meter long cables in…
- HYDROLANT 756/02 · Cable ops2002-04-02 → 2002-04-04Seismic survey in progress until 040300Z apr by M/V ramform explorer towing eight 6852 meter long cables in…
- HYDROLANT 753/02 · Cable ops2002-04-02 → 2002-04-05Seismic survey in progress until 050300Z apr by M/V cgg harmattan towing eight 6000 meter long cables in…
- HYDROLANT 752/02 · Cable ops2002-04-02 → 2002-04-06Seismic survey in progress until 05 apr by M/V ramform victory towing eight 6600 meter long cables in area…
- HYDROLANT 751/02 · Cable ops2002-04-02 → 2002-04-06Submarine cable operations in progress until 101500Z apr by M/V lodbrog towing submersible along trackline…
- HYDROLANT 748/02 · Cable ops2002-04-02 → 2002-04-07Seismic survey 030300Z to 070259Z apr by M/V veritas viking II towing six 6500 meter long cables in area…
- HYDROLANT 747/02 · Cable ops2002-04-01 → 2002-04-02Seismic survey in progress until 020300Z apr by M/V ramform explorer towing eight 6852 meter long cables in…
- HYDROLANT 724/02 · Nav aids2002-03-29 → 2002-04-04Radiobeacon at barra light 32-07.1S 052-04.6W inoperative
- HYDROLANT 722/02 · Cable ops2002-03-29 → 2002-04-01Seismic survey in progress until 31 mar by M/V ramform victory towing eight 6600 meter long cables in area…
- HYDROLANT 721/02 · Cable ops2002-03-29 → 2002-04-02Seismic survey in progress until 020300Z apr by M/V cgg harmattan towing eight 6000 meter long cables in…
- HYDROLANT 715/02 · Derelicts2002-03-28 → 2002-03-30Derelict F/V fu chang chun on fire and adrift in 42-13.8S 057-04.7W
- HYDROLANT 714/02 · Cable ops2002-03-28 → 2002-04-02Submarine cable operations 281500Z mar to 101500Z apr by M/V lodbrog towing submersible along trackline…
- HYDROLANT 712/02 · Cable ops2002-03-28 → 2002-04-02Seismic survey in progress until 030259Z apr by M/V veritas viking II towing six 6500 meter long cables in…
- HYDROLANT 711/02 · Cable ops2002-03-28 → 2002-03-28Submarine cable operations 281700Z mar to 101700Z apr by M/V lodbrog towing submersible along trackline…
- HYDROLANT 710/02 · Exercises2002-03-28 → 2002-04-18Hazardous operations 1230Z to 2000Z daily 01 thru 18 apr within 3.5 miles of 05-55S 035-04W
Sea boundaries: Flanders Marine Institute (2018), IHO Sea Areas v3, marineregions.org (CC BY 4.0). Not for navigation — follow official NAVAREA / coastal broadcasts.