South Atlantic Ocean
IHO sea area 32 · -70° to 20° E, -60° to 0° N
- in force
- 21
- last 12 months
- 128
- since 1975
- 17,973
- categories
- 21
In force now · 21
- NAVAREA 7 251/26 · Other2026-09-04As of 4 September 2026, mining and exploration vessels are operating off Orange River Mouth, Namibia; keep 2 nautical miles clear until further notice.
- NAVAREA 7 246/26 · Cable ops2026-08-24On 24 Aug 2026, seismic survey vessel Ramform Victory is towing 12 cables in the South Atlantic near Orange River mouth; wide berth requested.
- HYDROLANT 1462/26 · Exercises2026-07-29Hazardous operations are occurring off Brazil in a bounded area from August 3 through September 11.
- HYDROLANT 1457/26 · Exercises2026-07-29Hazardous operations are in progress in the South Atlantic until 060400Z June 27 near 24-39S 042-30W; two-mile berth requested.
- NAVAREA 7 221/26 · Other2026-07-29A special buoy with a yellow occulting light is spotted at 28-35.8S 013-54.7E off Oranjemund, South Atlantic; caution advised.
- NAVAREA II 269/26 · Cable ops2026-07-02Seismic survey by vessel Ramform Victory is in progress off Pointe Noire until further notice; wide berth requested.
- HYDROLANT 1258/26 · Nav aids2026-06-27An ocean data buoy is temporarily established in the South Atlantic off Brazil at 32-14.29S 051-58.16W, with cancellation December 26.
- HYDROLANT 1160/26 · Surveys2026-06-17Underwater operations by vessel Fugro Vaquita are in progress until 140001Z November, with wide berth requested; cancels HYDROLANT 1157/26.
- HYDROLANT 942/26 · Nav aids2026-05-13An ocean data acquisition buoy is established at 05-09.46S 035-09.81W in the South Atlantic off Brazil; this message cancels at 080001Z Nov 26.
- HYDROLANT 906/26 · Nav aids2026-05-08An ODAS buoy Bravo RN-L is temporarily established in the South Atlantic off Brazil at 04-53.00S 035-46.01W until 20 October.
- HYDROLANT 900/26 · Nav aids2026-05-07Tamandare Light in Brazil is unlit until November 2.
- HYDROLANT 882/26 · Nav aids2026-05-04Maceio light, 09-41.03S 035-43.38W, is unlit until 31 October; cancellation at 010001Z November 26.
- HYDROLANT 810/26 · Nav aids2026-04-23A yellow data buoy is established in the South Atlantic off Brazil at 17-58.12S 038-41.48W until October 19; message cancels October 26.
- HYDROLANT 657/26 · Nav aids2026-04-02Radar beacon at Cabo Sao Tome light is off air until 28 Sep.
- HYDROLANT 638/26 · Nav aids2026-03-31Ponta dos Meros light at 23-13.57S 044-20.83W is unlit until 26 September; cancel advisories.
- HYDROLANT 628/26 · Nav aids2026-03-30An ODAS buoy is established at 24-06.36S 045-38.78W; this message cancels 250001Z September 2026.
- HYDROLANT 627/26 · Nav aids2026-03-30Light at Laje da Conceicao, 24-14.18S 046-41.46W, is unlit until 24 September.
- HYDROLANT 582/26 · Wrecks2026-03-23Foul ground exists in a bounded area off Brazil until December 6, 2027.
- HYDROLANT 2010/25 · Surveys2025-11-28Underwater survey operations by vessel Fugro Vaquita off Brazil daily from 10:00 to 20:00 UTC until November 2, 2026; wide berth requested.
- HYDROLANT 1213/25 · Wrecks2025-07-19Depths are less than charted in three areas off Brazil in the South Atlantic.
- HYDROLANT 915/25 · Wrecks2025-05-31A reported depth of 18.3 meters at 20-35.71S 034-46.07W in the Western South Atlantic; previous warning cancelled.
Longest in force
- HYDROLANT 915/25 · Wrecks2025-05-31A reported depth of 18.3 meters at 20-35.71S 034-46.07W in the Western South Atlantic; previous warning cancelled.
- HYDROLANT 1213/25 · Wrecks2025-07-19Depths are less than charted in three areas off Brazil in the South Atlantic.
- HYDROLANT 2010/25 · Surveys2025-11-28Underwater survey operations by vessel Fugro Vaquita off Brazil daily from 10:00 to 20:00 UTC until November 2, 2026; wide berth requested.
- HYDROLANT 582/26 · Wrecks2026-03-23Foul ground exists in a bounded area off Brazil until December 6, 2027.
- HYDROLANT 627/26 · Nav aids2026-03-30Light at Laje da Conceicao, 24-14.18S 046-41.46W, is unlit until 24 September.
By year
75
78
97
98
99
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
By month (all years)
J
F
M
A
M
J
J
A
S
O
N
D
By category · since 1997
| Cable ops | 5,172 | 29% |
| Icebergs | 3,056 | 17% |
| Surveys | 2,311 | 13% |
| Nav aids | 1,965 | 11% |
| Exercises | 1,951 | 11% |
| Incidents | 1,590 | 9% |
| Quakes | 583 | 3% |
| Derelicts | 468 | 3% |
| Other | 270 | 2% |
| Missiles | 198 | 1% |
| Wrecks | 135 | 1% |
| Debris | 73 | 0% |
| Restricted | 66 | 0% |
| Structures | 60 | 0% |
| Containers | 38 | 0% |
| Piracy | 13 | 0% |
| Towing | 12 | 0% |
| Spills | 5 | 0% |
| Mines | 5 | 0% |
| Ordnance | 1 | 0% |
| War risk | 1 | 0% |
Archive · 17,952 cancelled
- HYDROLANT 4078/00 · Cable ops2000-12-10 → 2000-12-15Seismic survey in progress until 14 dec by M/V western atlas and M/V western patriot towing seven 3000 meter…
- HYDROLANT 4077/00 · Cable ops2000-12-10 → 2000-12-15Seismic survey in progress until 15 dec by M/V western regent and M/V western kenda towing eight 4000 meter…
- HYDROLANT 4076/00 · Cable ops2000-12-10 → 2000-12-13Cable laying operations in progress until 12 dec by M/V teliri towing 1500 meter long cable along trackline…
- HYDROLANT 4071/00 · Cable ops2000-12-09 → 2000-12-13Seismic survey in progress until 12 dec by M/V ramform victory, M/V falcon explorer and M/V sanco sea towing…
- HYDROLANT 4070/00 · Cable ops2000-12-09 → 2000-12-16Seismic survey in progress until 15 dec by M/V western inlet towing 6667 meter long cable in area bound by…
- HYDROLANT 4064/00 · Cable ops2000-12-08 → 2000-12-12Seismic survey in progress until 11 dec by M/V cgg harmattan towing six 6482 meter long cables in area bound…
- HYDROLANT 4063/00 · Cable ops2000-12-08 → 2000-12-10Underwater cable operations 08 thru 09 dec by M/V osa vigilant towing submersible vicinity 23-05S 043-29W
- HYDROLANT 4057/00 · Cable ops2000-12-07 → 2000-12-09Seismic survey in progress until 08 dec by M/V ramform victory, M/V falcon explorer and M/V sanco sea towing…
- HYDROLANT 4050/00 · Cable ops2000-12-06 → 2000-12-10Seismic survey in progress until 09 dec by M/V northern access towing 8704 meter long cable in area bound by…
- HYDROLANT 4049/00 · Cable ops2000-12-06 → 2000-12-08Seismic survey in progress until 07 dec by M/V cgg harmattan towing six 6482 meter long cables in area bound…
- HYDROLANT 4047/00 · Cable ops2000-12-06 → 2000-12-10Seismic survey in progress until 09 dec by M/V western atlas and M/V western patriot towing seven 3000 meter…
- HYDROLANT 4046/00 · Cable ops2000-12-06 → 2000-12-11Seismic survey in progress until 10 dec by M/V western regent and M/V western kenda towing eight 4000 meter…
- HYDROLANT 4045/00 · Cable ops2000-12-06 → 2000-12-10Cable laying operations in progress until 09 dec by M/V teliri towing 1500 meter long cable along trackline…
- HYDROLANT 4044/00 · Cable ops2000-12-06 → 2000-12-074000 meter long seismic cable adrift in 23-08S 039-40W at 051830Z dec
- HYDROLANT 4037/00 · Cable ops2000-12-05 → 2000-12-08Underwater cable operations 05 thru 07 dec by M/V osa vigilant vicinity 23-05S 043-29W
- HYDROLANT 4029/00 · Icebergs2000-12-04 → 2000-12-11Very large icebergs reported on 01 dec: a. A-22B, 20 miles by 20 miles, in 51-24S 039-18W
- HYDROLANT 4019/00 · Nav aids2000-12-03 → 2000-12-09Torres light 29-20.7S 049-43.6W unlit
- HYDROLANT 4017/00 · Cable ops2000-12-02 → 2000-12-06Seismic survey in progress until 05 dec by M/V ramform victory, M/V falcon explorer and M/V sanco sea towing…
- HYDROLANT 4013/00 · Incidents2000-12-02 → 2001-01-19M/V stamos reports crewman with heart attack in 13-29S 024-48W at 020720Z dec
- HYDROLANT 4012/00 · Surveys2000-12-02 → 2000-12-15Hydrographic survey 04 thru 14 dec by M/V sirius in area bound by 27-14.5S 048-45.0W, 27-14.5S 047-00.0W,…
Sea boundaries: Flanders Marine Institute (2018), IHO Sea Areas v3, marineregions.org (CC BY 4.0). Not for navigation — follow official NAVAREA / coastal broadcasts.