South Atlantic Ocean
IHO sea area 32 · -70° to 20° E, -60° to 0° N
- in force
- 21
- last 12 months
- 128
- since 1975
- 17,973
- categories
- 21
In force now · 21
- NAVAREA 7 251/26 · Other2026-09-04As of 4 September 2026, mining and exploration vessels are operating off Orange River Mouth, Namibia; keep 2 nautical miles clear until further notice.
- NAVAREA 7 246/26 · Cable ops2026-08-24On 24 Aug 2026, seismic survey vessel Ramform Victory is towing 12 cables in the South Atlantic near Orange River mouth; wide berth requested.
- HYDROLANT 1462/26 · Exercises2026-07-29Hazardous operations are occurring off Brazil in a bounded area from August 3 through September 11.
- HYDROLANT 1457/26 · Exercises2026-07-29Hazardous operations are in progress in the South Atlantic until 060400Z June 27 near 24-39S 042-30W; two-mile berth requested.
- NAVAREA 7 221/26 · Other2026-07-29A special buoy with a yellow occulting light is spotted at 28-35.8S 013-54.7E off Oranjemund, South Atlantic; caution advised.
- NAVAREA II 269/26 · Cable ops2026-07-02Seismic survey by vessel Ramform Victory is in progress off Pointe Noire until further notice; wide berth requested.
- HYDROLANT 1258/26 · Nav aids2026-06-27An ocean data buoy is temporarily established in the South Atlantic off Brazil at 32-14.29S 051-58.16W, with cancellation December 26.
- HYDROLANT 1160/26 · Surveys2026-06-17Underwater operations by vessel Fugro Vaquita are in progress until 140001Z November, with wide berth requested; cancels HYDROLANT 1157/26.
- HYDROLANT 942/26 · Nav aids2026-05-13An ocean data acquisition buoy is established at 05-09.46S 035-09.81W in the South Atlantic off Brazil; this message cancels at 080001Z Nov 26.
- HYDROLANT 906/26 · Nav aids2026-05-08An ODAS buoy Bravo RN-L is temporarily established in the South Atlantic off Brazil at 04-53.00S 035-46.01W until 20 October.
- HYDROLANT 900/26 · Nav aids2026-05-07Tamandare Light in Brazil is unlit until November 2.
- HYDROLANT 882/26 · Nav aids2026-05-04Maceio light, 09-41.03S 035-43.38W, is unlit until 31 October; cancellation at 010001Z November 26.
- HYDROLANT 810/26 · Nav aids2026-04-23A yellow data buoy is established in the South Atlantic off Brazil at 17-58.12S 038-41.48W until October 19; message cancels October 26.
- HYDROLANT 657/26 · Nav aids2026-04-02Radar beacon at Cabo Sao Tome light is off air until 28 Sep.
- HYDROLANT 638/26 · Nav aids2026-03-31Ponta dos Meros light at 23-13.57S 044-20.83W is unlit until 26 September; cancel advisories.
- HYDROLANT 628/26 · Nav aids2026-03-30An ODAS buoy is established at 24-06.36S 045-38.78W; this message cancels 250001Z September 2026.
- HYDROLANT 627/26 · Nav aids2026-03-30Light at Laje da Conceicao, 24-14.18S 046-41.46W, is unlit until 24 September.
- HYDROLANT 582/26 · Wrecks2026-03-23Foul ground exists in a bounded area off Brazil until December 6, 2027.
- HYDROLANT 2010/25 · Surveys2025-11-28Underwater survey operations by vessel Fugro Vaquita off Brazil daily from 10:00 to 20:00 UTC until November 2, 2026; wide berth requested.
- HYDROLANT 1213/25 · Wrecks2025-07-19Depths are less than charted in three areas off Brazil in the South Atlantic.
- HYDROLANT 915/25 · Wrecks2025-05-31A reported depth of 18.3 meters at 20-35.71S 034-46.07W in the Western South Atlantic; previous warning cancelled.
Longest in force
- HYDROLANT 915/25 · Wrecks2025-05-31A reported depth of 18.3 meters at 20-35.71S 034-46.07W in the Western South Atlantic; previous warning cancelled.
- HYDROLANT 1213/25 · Wrecks2025-07-19Depths are less than charted in three areas off Brazil in the South Atlantic.
- HYDROLANT 2010/25 · Surveys2025-11-28Underwater survey operations by vessel Fugro Vaquita off Brazil daily from 10:00 to 20:00 UTC until November 2, 2026; wide berth requested.
- HYDROLANT 582/26 · Wrecks2026-03-23Foul ground exists in a bounded area off Brazil until December 6, 2027.
- HYDROLANT 627/26 · Nav aids2026-03-30Light at Laje da Conceicao, 24-14.18S 046-41.46W, is unlit until 24 September.
By year
75
78
97
98
99
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
By month (all years)
J
F
M
A
M
J
J
A
S
O
N
D
By category · since 1997
| Cable ops | 5,172 | 29% |
| Icebergs | 3,056 | 17% |
| Surveys | 2,311 | 13% |
| Nav aids | 1,965 | 11% |
| Exercises | 1,951 | 11% |
| Incidents | 1,590 | 9% |
| Quakes | 583 | 3% |
| Derelicts | 468 | 3% |
| Other | 270 | 2% |
| Missiles | 198 | 1% |
| Wrecks | 135 | 1% |
| Debris | 73 | 0% |
| Restricted | 66 | 0% |
| Structures | 60 | 0% |
| Containers | 38 | 0% |
| Piracy | 13 | 0% |
| Towing | 12 | 0% |
| Spills | 5 | 0% |
| Mines | 5 | 0% |
| Ordnance | 1 | 0% |
| War risk | 1 | 0% |
Archive · 17,952 cancelled
- HYDROLANT 2548/00 · Cable ops2000-07-20 → 2000-07-21Seismic survey in progress until 21 jul by M/V new venture towing 8500 meter long cable in area bound by…
- HYDROLANT 2545/00 · Cable ops2000-07-19 → 2000-07-20Seismic survey in progress until further notice by M/V ramform explorer towing eight 6500 meter long cables…
- HYDROLANT 2540/00 · Nav aids2000-07-19 → 2000-07-25Comandatuba light 15-21.1S 038-58.8W unlit
- HYDROLANT 2539/00 · Cable ops2000-07-19 → 2000-07-22Seismic survey in progress until 21 jul by M/V cgg harmattan towing six 6482 meter long cables in area bound…
- HYDROLANT 2538/00 · Cable ops2000-07-19 → 2000-07-20Seismic survey in progress until 21 jul by M/V western regent and M/V kenda towing eight 4000 meter long…
- HYDROLANT 2529/00 · Cable ops2000-07-18 → 2000-07-19Seismic survey in progress until 190300Z jul by M/V geco tau towing 11000 meter long cable in area bound by…
- HYDROLANT 2527/00 · Cable ops2000-07-18 → 2000-07-21Seismic survey in progress until 20 jul by M/V polar search towing four 6482 meter long cables in area bound…
- HYDROLANT 2526/00 · Cable ops2000-07-18 → 2000-07-21Seismic survey in progress until 21 jul by M/V western atlas towing 400 meter long cable in area bound by…
- HYDROLANT 2517/00 · Cable ops2000-07-17 → 2000-07-20Seismic survey in progress until 19 jul by M/V ramform victory, M/V sanco capitain and M/V falcon explorer…
- HYDROLANT 2516/00 · Cable ops2000-07-17 → 2000-07-19Seismic survey in progress until 20 jul by M/V western regent towing eight 4000 meter long cables in area…
- HYDROLANT 2509/00 · Cable ops2000-07-16 → 2000-07-19Seismic survey in progress until 18 jul by M/V cgg harmattan towing six 6482 meter long cables in area…
- HYDROLANT 2508/00 · Cable ops2000-07-16 → 2000-07-19Seismic survey in progress until 18 jul by M/V kenda towing eight 3200 meter long cables in area bound by…
- HYDROLANT 2507/00 · Cable ops2000-07-16 → 2000-07-20Seismic survey in progress until 23 jul by M/V new venture towing 8500 meter long cable in area bound by…
- HYDROLANT 2506/00 · Cable ops2000-07-16 → 2000-07-18Seismic survey in progress until 17 jul by M/V geco tau towing 10186 meter long cable in area bound by…
- HYDROLANT 2503/00 · Cable ops2000-07-15 → 2000-08-04Seismic survey in progress until further notice by M/V cgg alize towing eight 4500 meter long cables in area…
- HYDROLANT 2495/00 · Cable ops2000-07-15 → 2000-07-17Seismic survey in progress until 16 jul by M/V western regent towing eight 4000 meter long cables in area…
- HYDROLANT 2494/00 · Cable ops2000-07-15 → 2000-07-16Seismic survey in progress until 15 jul by M/V kenda towing eight 3200 meter long cables in area bound by…
- HYDROLANT 2493/00 · Cable ops2000-07-15 → 2000-07-22Cable laying operations in progress until 220001Z jul by M/V teleri towing 1500 meter long cable along…
- HYDROLANT 2491/00 · Cable ops2000-07-15 → 2000-07-18Seismic survey in progress until 17 jul by M/V polar search towing four 6482 meter long cables in area bound…
- HYDROLANT 2490/00 · Cable ops2000-07-15 → 2000-07-18Seismic survey in progress until 18 jul by M/V western atlas towing 400 meter long cable in area bound by…
Sea boundaries: Flanders Marine Institute (2018), IHO Sea Areas v3, marineregions.org (CC BY 4.0). Not for navigation — follow official NAVAREA / coastal broadcasts.