merchant vessel · named in official warnings
M/V Pacific Sword
108 messages · 2000-05-22 to 2010-06-01
- status
- no warning in force
- first mention
- 2000-05-22 09:20Z
- latest mention
- 2010-06-01 17:20Z
- reported as
- Cable ops106Surveys2
- seas
- Indian OceanArabian SeaBay of BengalSouth China SeaTimor SeaSulu Sea
- last position
- 16.231, 81.751
Track · one row per mention
- mentions
- 108
- span
- 3,662 d
- in force
- 2,348 d
- along track
- 30,655.3 nm
- first → last
- 3,016.9 nm
| issued | type | where | position | status |
|---|---|---|---|---|
| 2000-05-22 | Cable ops | — | — | → 2000-05-22 |
| 2000-05-22 | Cable ops | — | — | → 2000-05-27 |
| 2000-05-27 | Cable ops | — | — | → 2000-05-28 |
| 2000-05-30 | Cable ops | Indian Ocean | -20.53, 116.08 | → 2000-06-01 |
| 2000-06-02 | Cable ops | — | — | → 2000-06-06 |
| 2000-06-06 | Cable ops | — | — | → 2000-06-14 |
| 2000-06-16 | Cable ops | — | — | → 2000-06-09 |
| 2000-07-09 | Cable ops | — | — | → 2000-07-10 |
| 2000-07-23 | Cable ops | — | — | → 2000-11-02 |
| 2000-11-04 | Cable ops | — | — | → 2000-11-12 |
| 2000-11-12 | Cable ops | — | — | → 2000-11-26 |
| 2000-11-26 | Cable ops | — | — | → 2000-11-26 |
| 2000-11-26 | Cable ops | — | — | → 2000-12-14 |
| 2000-12-14 | Cable ops | — | — | → 2000-12-18 |
| 2000-12-18 | Cable ops | — | — | → 2000-12-24 |
| 2000-12-26 | Cable ops | — | — | → 2000-12-31 |
| 2001-01-02 | Cable ops | — | — | → 2001-01-04 |
| 2001-01-04 | Cable ops | — | — | → 2001-01-04 |
| 2001-01-08 | Cable ops | — | — | → 2001-01-09 |
| 2001-01-09 | Cable ops | — | — | → 2001-01-16 |
| 2001-01-20 | Cable ops | — | — | → 2001-02-17 |
| 2001-02-17 | Cable ops | — | — | → 2001-02-24 |
| 2001-02-24 | Cable ops | — | — | → 2001-02-26 |
| 2001-03-01 | Cable ops | — | — | → 2001-03-27 |
| 2001-03-31 | Cable ops | — | — | → 2001-05-30 |
| 2001-06-02 | Cable ops | — | — | → 2001-06-26 |
| 2001-07-06 | Cable ops | — | — | → 2001-08-08 |
| 2001-08-10 | Cable ops | — | — | → 2001-09-09 |
| 2001-10-15 | Cable ops | — | — | → 2001-10-18 |
| 2001-10-20 | Cable ops | — | — | → 2001-10-25 |
| 2001-10-25 | Cable ops | — | — | → 2001-11-07 |
| 2001-11-08 | Cable ops | — | — | → 2001-11-19 |
| 2001-11-24 | Cable ops | Indian Ocean | -16.50, 120.00 | → 2002-01-02 |
| 2002-01-05 | Cable ops | — | — | → 2002-01-11 |
| 2002-01-11 | Cable ops | — | — | → 2002-01-14 |
| 2002-01-14 | Cable ops | — | — | → 2002-01-16 |
| 2002-01-16 | Cable ops | — | — | → 2002-01-17 |
| 2002-02-13 | Cable ops | Arabian Sea | 21.98, 68.25 | → 2002-03-31 |
| 2002-04-12 | Cable ops | Arabian Sea | 20.66, 70.70 | → 2002-04-12 |
| 2002-04-12 | Cable ops | Arabian Sea | 20.66, 70.70 | → 2002-04-26 |
| 2002-10-24 | Cable ops | — | — | → 2002-11-14 |
| 2002-11-14 | Cable ops | — | — | → 2002-11-20 |
| 2002-11-20 | Cable ops | — | — | → 2002-11-22 |
| 2002-11-22 | Cable ops | — | — | → 2002-11-25 |
| 2002-11-27 | Cable ops | — | — | → 2002-12-02 |
| 2002-12-02 | Cable ops | — | — | → 2002-12-20 |
| 2002-12-27 | Cable ops | — | — | → 2003-03-21 |
| 2003-03-21 | Cable ops | — | — | → 2003-03-31 |
| 2003-04-03 | Cable ops | — | — | → 2003-05-12 |
| 2003-05-01 | Cable ops | — | — | → 2003-05-01 |
| 2003-09-13 | Cable ops | South China Sea | 20.53, 109.55 | → 2003-10-01 |
| 2003-10-21 | Cable ops | — | — | → 2003-11-01 |
| 2003-11-01 | Cable ops | — | — | → 2003-11-10 |
| 2003-11-10 | Cable ops | — | — | → 2003-11-19 |
| 2003-11-19 | Cable ops | — | — | → 2003-12-01 |
| 2003-12-01 | Cable ops | — | — | → 2003-12-01 |
| 2003-12-01 | Cable ops | — | — | → 2003-12-18 |
| 2004-01-14 | Cable ops | Bay of Bengal | 15.98, 83.25 | → 2004-02-26 |
| 2004-02-26 | Cable ops | Bay of Bengal | 12.29, 80.83 | → 2004-04-01 |
| 2004-07-30 | Cable ops | — | — | → 2004-08-16 |
| 2004-08-16 | Cable ops | — | — | → 2004-08-21 |
| 2004-08-21 | Cable ops | Indian Ocean | -13.45, 125.00 | → 2004-08-22 |
| 2004-08-22 | Cable ops | — | — | → 2004-08-24 |
| 2004-08-28 | Cable ops | — | — | → 2004-09-06 |
| 2004-09-06 | Cable ops | Timor Sea | -13.68, 128.26 | → 2004-09-06 |
| 2004-09-17 | Cable ops | — | — | → 2005-02-09 |
| 2004-10-01 | Cable ops | — | — | → 2004-10-02 |
| 2004-10-04 | Cable ops | — | — | → 2004-10-13 |
| 2004-10-14 | Cable ops | — | — | → 2004-10-22 |
| 2004-10-22 | Cable ops | — | — | → 2004-11-04 |
| 2004-11-06 | Cable ops | — | — | → 2004-12-08 |
| 2004-12-08 | Cable ops | — | — | → 2005-01-02 |
| 2005-01-02 | Cable ops | — | — | → 2005-01-12 |
| 2005-01-14 | Cable ops | — | — | → 2005-02-06 |
| 2005-02-26 | Cable ops | Bay of Bengal | 16.18, 81.37 | → 2005-07-03 |
| 2005-07-03 | Cable ops | South China Sea | 9.58, 115.54 | → 2005-08-11 |
| 2005-08-10 | Surveys | South China Sea | 5.16, 114.63 | → 2005-08-11 |
| 2005-08-11 | Cable ops | South China Sea | 5.16, 114.63 | → 2005-08-12 |
| 2005-10-01 | Cable ops | — | — | → 2005-10-27 |
| 2005-10-29 | Cable ops | — | — | → 2005-11-20 |
| 2005-11-21 | Cable ops | — | — | → 2005-11-23 |
| 2005-11-24 | Cable ops | — | — | → 2005-11-30 |
| 2005-12-03 | Cable ops | — | — | → 2005-12-07 |
| 2005-12-07 | Cable ops | — | — | → 2005-12-12 |
| 2005-12-12 | Cable ops | — | — | → 2006-01-09 |
| 2006-01-09 | Cable ops | — | — | → 2006-02-05 |
| 2006-02-11 | Cable ops | — | — | → 2006-03-09 |
| 2006-03-10 | Cable ops | — | — | → 2006-03-17 |
| 2006-12-27 | Cable ops | Timor Sea | -11.63, 125.02 | → 2007-01-15 |
| 2006-12-28 | Cable ops | Timor Sea | -11.63, 125.02 | → 2007-01-16 |
| 2007-02-02 | Cable ops | — | — | → 2007-02-05 |
| 2007-02-10 | Cable ops | Indian Ocean | -21.48, 114.00 | → 2007-10-17 |
| 2007-10-17 | Cable ops | South China Sea | 10.06, 118.00 | → 2007-11-28 |
| 2007-12-31 | Cable ops | Arabian Sea | 20.74, 71.95 | → 2008-04-26 |
| 2008-11-05 | Cable ops | — | — | → 2008-11-23 |
| 2008-11-23 | Surveys | — | — | → 2009-03-20 |
| 2009-04-12 | Cable ops | Arabian Sea | 20.61, 71.76 | → 2009-04-30 |
| 2009-04-30 | Cable ops | Arabian Sea | 20.77, 71.69 | → 2009-07-01 |
| 2009-07-15 | Cable ops | Sulu Sea | 7.81, 117.80 | → 2009-08-20 |
| 2009-08-20 | Cable ops | Sulu Sea | 11.67, 121.51 | → 2009-09-07 |
| 2009-10-30 | Cable ops | Arabian Sea | 20.80, 71.71 | → 2009-11-16 |
| 2009-11-16 | Cable ops | Arabian Sea | 20.88, 71.71 | → 2009-12-16 |
| 2009-12-18 | Cable ops | Arabian Sea | 20.91, 71.66 | → 2010-01-18 |
| 2010-02-16 | Cable ops | India-east Coast | 16.14, 81.54 | → 2010-03-01 |
| 2010-02-27 | Cable ops | India-east Coast | 16.22, 81.62 | → 2010-04-15 |
| 2010-04-19 | Cable ops | Bay of Bengal · India-east Coast | 15.98, 81.80 | → 2010-05-17 |
| 2010-05-21 | Cable ops | India-east Coast | 16.25, 81.74 | → 2010-06-01 |
| 2010-06-01 | Cable ops | India-east Coast | 16.23, 81.75 | → 2010-06-16 |
Messages · 108, oldest first
- 1Cable ops·HYDROPAC 751/002000-05-22 09:20Z → cancelled 2000-05-22 12:50ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 17-50S 19-40S AND 106-30E 110-00E. WIDE BERTH REQUESTED.
- 2Cable ops·HYDROPAC 752/002000-05-22 12:50Z → cancelled 2000-05-27 03:19ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 17-30S 20-00S AND 112-00E 116-00E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 751/00.
- 3Cable ops·HYDROPAC 784/002000-05-27 03:19Z → cancelled 2000-05-28 19:40ZSeismic survey in progress until further notice by M/V pacific sword towing 4.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 4.5 MILE LONG CABLE IN AREA BETWEEN 17-30S 20-00S AND 112-00E 116-00E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 752/00.
- 4Cable ops·HYDROPAC 806/002000-05-30 06:20Z → cancelled 2000-06-01 12:24ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…Indian Ocean
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BOUND BY 20-20S 116-35E, 20-30S 115-50E, 20-45S 115-50E. WIDE BERTH REQUESTED.
- 5Cable ops·HYDROPAC 825/002000-06-02 02:10Z → cancelled 2000-06-06 16:31ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BETWEEN 17-30S 20-00S AND 112-00E 116-00E. WIDE BERTH REQUESTED.
- 6Cable ops·HYDROPAC 845/002000-06-06 16:31Z → cancelled 2000-06-14 02:31ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BETWEEN 20-20S 21-10S AND 113-00E 114-40E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 825/00.
- 7Cable ops·HYDROPAC 892/002000-06-16 16:44Z → cancelled 2000-06-09 03:43ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 16-30S 19-00S AND 116-00E 118-30E. WIDE BERTH REQUESTED.
- 8Cable ops·HYDROPAC 1009/002000-07-09 03:43Z → cancelled 2000-07-10 10:20ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 17-45S 18-20S AND 118-30E 120-00E. 2. CANCEL HYDROPAC 892/00.
- 9Cable ops·HYDROPAC 1087/002000-07-23 03:35Z → cancelled 2000-11-02 01:07ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 14-25S 14-45S AND 128-30E 129-00E. WIDE BERTH REQUESTED.
- 10Cable ops·HYDROPAC 1617/002000-11-04 01:20Z → cancelled 2000-11-12 16:25ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 12-50S 13-30S AND 124-30E 125-30E. WIDE BERTH REQUESTED.
- 11Cable ops·HYDROPAC 1656/002000-11-12 16:25Z → cancelled 2000-11-26 09:30ZSeismic survey in progress until further notice by M/V pacific sword towing two mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO MILE LONG CABLE IN AREA BETWEEN 14-22S 15-06S AND 123-24E 124-21E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 1617/00.
- 12Cable ops·HYDROPAC 1717/002000-11-26 09:30Z → cancelled 2000-11-26 15:34ZSeismic survey in progress until further notice by M/V pacific sword towing two mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO MILE LONG CABLE IN AREA BETWEEN 13-25S 15-30S AND 121-20E 123-12E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 1656/00.
- 13Cable ops·HYDROPAC 1721/002000-11-26 15:34Z → cancelled 2000-12-14 18:02ZSeismic survey in progress until further notice by M/V pacific sword towing two mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO MILE LONG CABLE IN AREA BETWEEN 12-25S 15-30S AND 121-20E 123-12E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 1717/00.
- 14Cable ops·HYDROPAC 1776/002000-12-14 18:02Z → cancelled 2000-12-18 18:39ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 14-35S 15-20S AND 121-35E 122-40E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 1721/00.
- 15Cable ops·HYDROPAC 1794/002000-12-18 18:39Z → cancelled 2000-12-24 22:25ZSeismic survey in progress until further notice by M/V pacific sword towing two mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO MILE LONG CABLE IN AREA BETWEEN 14-30S 15-30S AND 121-40E 122-20E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 1776/00.
- 16Cable ops·HYDROPAC 1840/002000-12-26 07:40Z → cancelled 2000-12-31 17:09ZSeismic survey in progress until further notice by M/V pacific sword towing two mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO MILE LONG CABLE IN AREA BETWEEN 19-05S 19-40S AND 117-30E 117-55E. WIDE BERTH REQUESTED.
- 17Cable ops·HYDROPAC 5/012001-01-02 08:10Z → cancelled 2001-01-04 11:15ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 21-25S 21-33S AND 114-28E 114-38E. WIDE BERTH REQUESTED.
- 18Cable ops·HYDROPAC 17/012001-01-04 11:15Z → cancelled 2001-01-04 21:00ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile cable in area between…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE CABLE IN AREA BETWEEN 21-15S 21-35S AND 114-05E 114-50E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 5/01, OPERATIONS COMPLETED.
- 19Cable ops·HYDROPAC 38/012001-01-08 18:00Z → cancelled 2001-01-09 01:39ZSeismic survey in progress until further notice by M/V pacific sword towing two three mile long cables in…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO THREE MILE LONG CABLES IN AREA BETWEEN 21-00S 21-30S AND 114-30E 114-45E. WIDE BERTH REQUESTED.
- 20Cable ops·HYDROPAC 40/012001-01-09 01:39Z → cancelled 2001-01-16 05:27ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 21-00S 21-30S AND 114-45E 115-30E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 38/01.
- 21Cable ops·HYDROPAC 99/012001-01-20 10:07Z → cancelled 2001-02-17 05:45ZSeismic survey in progress until further notice by M/V pacific sword towing two 2.0 mile long cables in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO 2.0 MILE LONG CABLES IN AREA BETWEEN 21-08.4S 21-30.0S AND 115-05.0E 115-30.0E. WIDE BERTH REQUESTED.
- 22Cable ops·HYDROPAC 265/012001-02-17 07:35Z → cancelled 2001-02-24 08:20ZSeismic survey in progress until further notice by M/V pacific sword towing two 2.0 mile long cables in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO 2.0 MILE LONG CABLES IN AREA BETWEEN 21-08S 21-21S AND 115-18E 115-34E. WIDE BERTH REQUESTED.
- 23Cable ops·HYDROPAC 305/012001-02-24 08:20Z → cancelled 2001-02-26 01:15ZSeismic survey in progress until further notice by M/V pacific sword towing two mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO MILE LONG CABLE IN AREA BETWEEN 21-15S 21-40S AND 114-15E 115-00E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 265/01.
- 24Cable ops·HYDROPAC 337/012001-03-01 02:25Z → cancelled 2001-03-27 14:18ZSeismic survey in progress until further notice by M/V pacific sword towing two 2.5 mile long cables in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO 2.5 MILE LONG CABLES IN AREA BETWEEN 20-55S 21-35S AND 114-45E 115-40E. WIDE BERTH REQUESTED.
- 25Cable ops·HYDROPAC 486/012001-03-31 03:23Z → cancelled 2001-05-30 09:10ZSeismic survey in progress until further notice by M/V pacific sword towing two 2.0 mile long cables in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO 2.0 MILE LONG CABLES IN AREA BETWEEN 21-03S 21-30S AND 115-05E 115-32E. WIDE BERTH REQUESTED.
- 26Cable ops·HYDROPAC 848/012001-06-02 07:40Z → cancelled 2001-06-26 09:25ZSeismic survey in progress until further notice by M/V pacific sword towing two 2.0 mile long cables in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO 2.0 MILE LONG CABLES IN AREA BETWEEN 21-00S 21-30S AND 115-00E 115-30E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 643/01(71).
- 27Cable ops·HYDROPAC 1055/012001-07-06 19:35Z → cancelled 2001-08-08 09:40ZSeismic survey in progress until further notice by M/V pacific sword towing two 2.5 mile long cables in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO 2.5 MILE LONG CABLES IN AREA BETWEEN 20-45S 21-45S AND 114-10E 115-30E. WIDE BERTH REQUESTED.
- 28Cable ops·HYDROPAC 1291/012001-08-10 15:50Z → cancelled 2001-09-09 02:55ZSeismic survey in progress until further notice by M/V pacific sword in area between 21-00S 21-18S and…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD IN AREA BETWEEN 21-00S 21-18S AND 115-03E 115-18E. WIDE BERTH REQUESTED.
- 29Cable ops·HYDROPAC 1663/012001-10-15 07:50Z → cancelled 2001-10-18 22:00ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 21-10S 21-40S AND 114-10E 114-50E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 1651/01(96), 1636/01 REFERS. 3. CANCEL HYDROPAC 1656/01, AID RESTORED.
- 30Cable ops·HYDROPAC 1695/012001-10-20 02:40Z → cancelled 2001-10-25 16:17ZSeismic survey in progress until further notice by M/V pacific sword towing 3.5 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 3.5 MILE LONG CABLE IN AREA BETWEEN 17-30S 20-00S AND 112-00E 114-30E. WIDE BERTH REQUESTED.
- 31Cable ops·HYDROPAC 1726/012001-10-25 21:15Z → cancelled 2001-11-07 14:55ZSeismic survey in progress until further notice by M/V pacific sword towing 3.5 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 3.5 MILE LONG CABLE IN AREA BETWEEN 18-30S 20-00S AND 114-00E 115-50E. WIDE BERTH REQUESTED.
- 32Cable ops·HYDROPAC 1798/012001-11-08 16:37Z → cancelled 2001-11-19 08:55ZSeismic survey in progress until further notice by M/V pacific sword towing two three mile long cables in…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO THREE MILE LONG CABLES IN AREA BETWEEN 21-00S 21-36S AND 114-35E 115-25E. WIDE BERTH REQUESTED.
- 33Cable ops·HYDROPAC 1910/012001-11-24 15:23Z → cancelled 2002-01-02 00:32ZSeismic survey in progress until further notice by M/V pacific sword towing 3.5 mile long cable in area…Indian Ocean
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 3.5 MILE LONG CABLE IN AREA BETWEEN 15-00S 118-30E AND 18-00S 121-30E. WIDE BERTH REQUESTED.
- 34Cable ops·HYDROPAC 29/022002-01-05 11:20Z → cancelled 2002-01-11 11:50ZSeismic survey in progress until further notice by M/V pacific sword towing 3.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 3.5 MILE LONG CABLE IN AREA BETWEEN 12-40S 13-40S AND 125-05E 126-00E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 12/02(74), OPERATIONS SUSPENDED. 3. CANCEL HYDROPAC 28/02(75), VESSEL LOCATED.
- 35Cable ops·HYDROPAC 62/022002-01-11 00:48Z → cancelled 2002-01-14 15:54ZSeismic survey in progress until further notice by M/V pacific sword towing 3.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 3.5 MILE LONG CABLE IN AREA BETWEEN 12-50S 13-35S AND 123-45E 124-30E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 11/02(74,75).
- 36Cable ops·HYDROPAC 88/022002-01-14 15:54Z → cancelled 2002-01-16 10:20ZSeismic survey in progress until further notice by M/V pacific sword towing 3.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 3.5 MILE LONG CABLE IN AREA BETWEEN 11-10S 11-50S AND 124-20E 125-00E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 62/02.
- 37Cable ops·HYDROPAC 102/022002-01-16 10:20Z → cancelled 2002-01-17 01:00ZSeismic survey in progress until further notice by M/V pacific sword towing two 3.5 mile long cables in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO 3.5 MILE LONG CABLES IN AREA BETWEEN 11-10S 10-45S AND 125-05E 125-50E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 97/02, AID RESTORED. 3. CANCEL HYDROPAC 101/02, VESSEL LOCATED SAFE. 4. CANCEL HYDROPAC 88/02.
- 38Cable ops·HYDROPAC 271/022002-02-13 12:40Z → cancelled 2002-03-31 00:00ZSeismic survey in progress until 30 mar by M/V pacific sword towing 5000 meter long cable in area bound by…Arabian Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 30 MAR BY M/V PACIFIC SWORD TOWING 5000 METER LONG CABLE IN AREA BOUND BY 22-05N 068-17E, 22-03N 068-23E, 21-50N 068-16E, 21-57N 068-08E, 22-02N 068-09E. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 31 MAR.
- 39Cable ops·HYDROLANT 845/022002-04-12 15:47Z → cancelled 2002-04-12 20:56ZSeismic survey in progress until 25 apr by M/V pacific sword towing 5000 meter long cable in area bound by…Arabian Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 25 APR BY M/V PACIFIC SWORD TOWING 5000 METER LONG CABLE IN AREA BOUND BY 20-52.7N 071-27.6E, 21-10.1N 070-02.2E, 20-17.0N 070-03.4E, 20-18.3N 071-27.4E. 2. CANCEL THIS MSG 26 APR.
- 40Cable ops·HYDROPAC 681/022002-04-12 20:59Z → cancelled 2002-04-26 00:00ZSeismic survey in progress until 25 apr by M/V pacific sword towing 5000 meter long cable in area bound by…Arabian Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 25 APR BY M/V PACIFIC SWORD TOWING 5000 METER LONG CABLE IN AREA BOUND BY 20-52.7N 071-27.6E, 21-10.1N 070-02.2E, 20-17.0N 070-03.4E, 20-18.3N 071-27.4E. 2. CANCEL THIS MSG 26 APR.
- 41Cable ops·HYDROPAC 1986/022002-10-24 10:55Z → cancelled 2002-11-14 02:30ZSeismic survey in progress until further notice by M/V pacific sword towing two 3 mile long cables in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO 3 MILE LONG CABLES IN AREA BETWEEN 20-30S 21-10S AND 115-00E 115-20E. WIDE BERTH REQUESTED.
- 42Cable ops·HYDROPAC 2103/022002-11-14 02:45Z → cancelled 2002-11-20 08:10ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 20-00S 20-30S AND 114-30E 115-00E. WIDE BERTH REQUESTED.
- 43Cable ops·HYDROPAC 2157/022002-11-20 08:10Z → cancelled 2002-11-22 06:05ZSeismic survey in progress until further notice by M/V pacific sword towing two 3 mile long cables in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO 3 MILE LONG CABLES IN AREA BETWEEN 20-00S 20-30S AND 114-30E 115-00E. 2. CANCEL HYDROPAC 2103/02.
- 44Cable ops·HYDROPAC 2174/022002-11-22 06:05Z → cancelled 2002-11-25 14:50ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cables in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLES IN AREA BETWEEN 20-00S 20-30S AND 114-30E 115-00E. 2. CANCEL HYDROPAC 2157/02.
- 45Cable ops·HYDROPAC 2222/022002-11-27 19:42Z → cancelled 2002-12-02 02:20ZSeismic survey in progress until further notice by M/V pacific sword in area between 20-30S 21-10S and…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD IN AREA BETWEEN 20-30S 21-10S AND 115-00E 115-20E. WIDE BERTH REQUESTED.
- 46Cable ops·HYDROPAC 2258/022002-12-02 02:20Z → cancelled 2002-12-20 11:23ZSeismic survey in progress until further notice by M/V pacific sword towing two three mile long cables in…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO THREE MILE LONG CABLES IN AREA BETWEEN 20-00S 20-45S AND 114-30E 115-20E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 2222/02.
- 47Cable ops·HYDROPAC 2437/022002-12-27 13:10Z → cancelled 2003-03-21 09:50ZSeismic survey in progress until further notice by M/V pacific sword towing 3.7 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 3.7 MILE LONG CABLE IN AREA BETWEEN 07-00S 07-27S AND 112-33E 114-27E.
- 48Cable ops·HYDROPAC 504/032003-03-21 09:50Z → cancelled 2003-03-31 00:58ZSeismic survey 22 mar until further notice by M/V pacific sword towing 3600 meter long cable in area between…
1. SEISMIC SURVEY 22 MAR UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 3600 METER LONG CABLE IN AREA BETWEEN 39-00S 39-45S AND 173-00E 173-40E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 503/03(74,75,76), PERSONS RESCUED. 3. CANCEL HYDROPAC 2437/02(72).
- 49Cable ops·HYDROPAC 589/032003-04-03 08:40Z → cancelled 2003-05-12 00:51ZSeismic survey in progress until further notice by M/V pacific sword towing two mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO MILE LONG CABLE IN AREA BETWEEN 39-00S 39-50S AND 172-40E 173-40E. WIDE BERTH REQUESTED.
- 50Cable ops·HYDROPAC 758/032003-05-01 19:40Z → cancelled 2003-05-01 19:58ZSeismic survey in progress until further notice by M/V pacific sword towing two mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO MILE LONG CABLE IN AREA BETWEEN 39-00S 39-50S AND 172-40E 173-40E. WIDE BERTH REQUESTED.
- 51Cable ops·HYDROPAC 1577/032003-09-13 15:23Z → cancelled 2003-10-01 00:00ZSeismic survey in progress until 30 sep by M/V pacific sword towing 4300 meter long cable in area bound by…South China Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 30 SEP BY M/V PACIFIC SWORD TOWING 4300 METER LONG CABLE IN AREA BOUND BY 20-39N 109-22E, 20-39N 109-38E, 20-35N 109-45E, 20-25N 109-45E, 20-25N 109-22E. 2. CANCEL THIS MSG 01 OCT.
- 52Cable ops·HYDROPAC 1825/032003-10-21 12:55Z → cancelled 2003-11-01 14:20ZSeismic survey in progress until further notice by M/V pacific sword towing cables in area between 29-20S…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING CABLES IN AREA BETWEEN 29-20S 29-35S AND 114-43E 114-57E. THREE MILE BERTH REQUESTED.
- 53Cable ops·HYDROPAC 1904/032003-11-01 14:20Z → cancelled 2003-11-10 17:35ZSeismic survey in progress until further notice by M/V pacific sword towing cables in area between 28-51S…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING CABLES IN AREA BETWEEN 28-51S 29-25S AND 114-25E COASTLINE. 2.5 MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1825/03.
- 54Cable ops·HYDROPAC 1944/032003-11-10 17:35Z → cancelled 2003-11-19 17:00ZSeismic survey in progress until further notice by M/V pacific sword towing 1.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 1.5 MILE LONG CABLE IN AREA BETWEEN 28-25S 29-00S AND 113-53E 114-28E. FOUR MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1904/03.
- 55Cable ops·HYDROPAC 1996/032003-11-19 17:00Z → cancelled 2003-12-01 10:40ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BETWEEN 28-30S 30-00S AND 112-30E 114-00E. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1994/03(74,75). 3. CANCEL HYDROPAC 1944/03.
- 56Cable ops·HYDROPAC 2087/032003-12-01 10:40Z → cancelled 2003-12-01 21:15ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 27-10S 28-00S AND 111-40E 113-00E. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1996/03.
- 57Cable ops·HYDROPAC 2091/032003-12-01 21:15Z → cancelled 2003-12-18 17:50ZSeismic survey in progress until further notice by M/V pacific sword towing 4.5 mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 4.5 MILE LONG CABLE IN AREA BETWEEN 27-10S 28-00S AND 111-40E 113-00E. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 2087/03.
- 58Cable ops·HYDROPAC 65/042004-01-14 12:10Z → cancelled 2004-02-26 15:45ZSeismic survey in progress until further notice by M/V pacific sword towing 8000 meter long cable in area…Bay of Bengal
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 8000 METER LONG CABLE IN AREA BOUND BY 1622N 082-30E, 16-32N 084-00E, 1526N 084-00E, 15-26N 082-30E. SIX MILE BERTH REQUESTED.
- 59Cable ops·HYDROPAC 365/042004-02-26 15:45Z → cancelled 2004-04-01 00:00ZSeismic survey in progress until 31 mar by M/V pacific sword towing 9000 meter long cable in area bound by…Bay of Bengal
1. SEISMIC SURVEY IN PROGRESS UNTIL 31 MAR BY M/V PACIFIC SWORD TOWING 9000 METER LONG CABLE IN AREA BOUND BY 13-04.0N 080-40.0E, 13-04.0N 081-20.0E, 11-40.0N 081-20.0E, 11-40.0N 080-00.0E, 12-24.0N 080-24.0E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 65/04. 3. CANCEL THIS MSG 01 APR.
- 60Cable ops·HYDROPAC 1244/042004-07-30 17:44Z → cancelled 2004-08-16 16:15ZSeismic survey in progress until further notice by M/V pacific sword towing five mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FIVE MILE LONG CABLE IN AREA BETWEEN 12-30S 15-00S AND 121-30E 124-00E.
- 61Cable ops·HYDROPAC 1339/042004-08-16 16:15Z → cancelled 2004-08-21 19:00ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BETWEEN 12-10S 13-00S AND 124-00E 125-30E. 2. CANCEL HYDROPAC 1244/04.
- 62Cable ops·HYDROPAC 1364/042004-08-21 19:00Z → cancelled 2004-08-22 06:12ZSeismic survey in progress until further notice by M/V pacific sword towing 2.2 mile long cable in 13-27S…Indian Ocean
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.2 MILE LONG CABLE IN 13-27S 125-00E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1339/04.
- 63Cable ops·HYDROPAC 1366/042004-08-22 06:12Z → cancelled 2004-08-24 23:08ZSeismic survey in progress until further notice by M/V pacific sword towing 4000 meter long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 4000 METER LONG CABLE IN AREA BETWEEN 13-00S 14-00S AND 124-00E 125-30E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1364/04.
- 64Cable ops·HYDROPAC 1392/042004-08-28 00:16Z → cancelled 2004-09-06 00:16ZSeismic survey in progress until further notice by M/V pacific sword towing 4.5 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 4.5 MILE LONG CABLE IN AREA BETWEEN 10-00S 11-00S AND 129-05E 130-20E. FIVE MILE BERTH REQUESTED.
- 65Cable ops·HYDROPAC 1440/042004-09-06 00:16Z → cancelled 2004-09-06 12:16ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…Timor Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BOUND BY 14-00S 127-30E, 13-00S 127-30E, 13-00S 128-30E, 14-30S 129-20E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1392/04.
- 66Cable ops·HYDROPAC 1495/042004-09-17 22:46Z → cancelled 2005-02-09 15:38ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 13-25S 14-10S AND 128-25E 129-10E. FOUR MILE BERTH REQUESTED.
- 67Cable ops·HYDROPAC 1564/042004-10-01 05:36Z → cancelled 2004-10-02 17:37ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 13-25S 14-10S AND 128-25E 129-10E. FOUR MILE BERTH REQUESTED.
- 68Cable ops·HYDROPAC 1581/042004-10-04 14:57Z → cancelled 2004-10-13 10:14ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 13-25S 14-10S AND 128-25E 129-10E. FOUR MILE BERTH REQUESTED.
- 69Cable ops·HYDROPAC 1619/042004-10-14 13:54Z → cancelled 2004-10-22 18:24ZSeismic survey in progress until further notice by M/V pacific sword in area between 31-25S 35-00S and…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD IN AREA BETWEEN 31-25S 35-00S AND 111-00E 115-40E. SIX MILE BERTH REQUESTED.
- 70Cable ops·HYDROPAC 1671/042004-10-22 18:24Z → cancelled 2004-11-04 03:20ZSeismic survey in progress until further notice by M/V pacific sword in area between 31-25S 35-00S and…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD IN AREA BETWEEN 31-25S 35-00S AND 111-00E 115-40E. SEVEN MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1619/04. 3. CANCEL HYDROPAC 1635/04.
- 71Cable ops·HYDROPAC 1753/042004-11-06 12:15Z → cancelled 2004-12-08 18:01ZSeismic survey in progress until further notice by M/V pacific sword towing five mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FIVE MILE LONG CABLE IN AREA BETWEEN 34-00S 38-00S AND 116-00E 121-30E. SEVEN MILE BERTH REQUESTED.
- 72Cable ops·HYDROPAC 1884/042004-12-08 18:01Z → cancelled 2005-01-02 08:38ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 17-20S 19-30S AND 113-00E 115-00E. FOUR MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1753/04.
- 73Cable ops·HYDROPAC 8/052005-01-02 08:38Z → cancelled 2005-01-12 04:48ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BETWEEN 18-35S 20-20S AND 113-20E 114-30E. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1884/04.
- 74Cable ops·HYDROPAC 86/052005-01-14 03:47Z → cancelled 2005-02-06 15:41ZSeismic survey in progress until further notice by M/V pacific sword towing 3.5 long cable in area between…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 3.5 LONG CABLE IN AREA BETWEEN 18-40S 20-00S AND 113-00E 114-20E. FIVE MILE BERTH REQUESTED.
- 75Cable ops·HYDROPAC 364/052005-02-26 14:18Z → cancelled 2005-07-03 19:08ZSeismic survey in progress until 11 jul by M/V pacific sword towing two 4800 meter long cables in area bound…Bay of Bengal
1. SEISMIC SURVEY IN PROGRESS UNTIL 11 JUL BY M/V PACIFIC SWORD TOWING TWO 4800 METER LONG CABLES IN AREA BOUND BY 15-45.0N 081-10.0E, 15-45.0N 081-35.0E, 16-15.0N 081-35.0E, 16-55.0N 081-16.0E, 15-55.0N 081-10.0E. SIX MILE BERTH REQUESTED. 2. CANCEL THIS MSG 12 JUL.
- 76Cable ops·HYDROPAC 1051/052005-07-03 19:08Z → cancelled 2005-08-11 12:42ZSeismic survey 04 jul thru 17 aug by M/V pacific sword towing 4500 meter long cables vicinity 09-35.0N…South China Sea
1. SEISMIC SURVEY 04 JUL THRU 17 AUG BY M/V PACIFIC SWORD TOWING 4500 METER LONG CABLES VICINITY 09-35.0N 115-32.5E. 2. CANCEL HYDROPAC 364/05. 3. CANCEL THIS MSG 18 AUG.
- 77Surveys·HYDROPAC 1292/052005-08-10 14:57Z → cancelled 2005-08-11 11:27ZSurvey operations in progress until 10 sep by M/V pacific sword in area bound by 05-16-57N 114-31-20E,…South China Sea
1. SURVEY OPERATIONS IN PROGRESS UNTIL 10 SEP BY M/V PACIFIC SWORD IN AREA BOUND BY 05-16-57N 114-31-20E, 05-20-13N 114-34-37E, 05-07-18N 114-47-27E, 04-59-55N 114-40-02E, 05-08-41N 114-31-19E. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 11 SEP.
- 78Cable ops·HYDROPAC 1295/052005-08-11 00:42Z → cancelled 2005-08-12 02:23ZSeismic survey in progress until 10 sep by M/V pacific sword in area bound by 04-59.9N 114-40.0E, 05-08.7N…South China Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 10 SEP BY M/V PACIFIC SWORD IN AREA BOUND BY 04-59.9N 114-40.0E, 05-08.7N 114-31.3E, 05-17.0N 114-31.3E, 05-20.2N 114-34.6E, 05-07.3N 114-47.5E. 2. CANCEL HYDROPAC 1051/05. 3. CANCEL THIS MSG 11 SEP.
- 79Cable ops·HYDROPAC 1638/052005-10-01 11:32Z → cancelled 2005-10-27 17:35ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 18-50S 21-40S AND 111-50E 113-25E. FIVE MILE BERTH REQUESTED.
- 80Cable ops·HYDROPAC 1824/052005-10-29 14:13Z → cancelled 2005-11-20 12:45ZSeismic survey in progress until further notice by M/V pacific sword towing three mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING THREE MILE LONG CABLE IN AREA BETWEEN 18-50S 21-40S AND 111-50E 113-25E. FIVE MILE BERTH REQUESTED.
- 81Cable ops·HYDROPAC 1946/052005-11-21 06:51Z → cancelled 2005-11-23 13:41ZSeismic survey in progress until further notice by M/V pacific sword towing 1.5 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 1.5 MILE LONG CABLE IN AREA BETWEEN 21-26S 21-37S AND 115-00E 115-10E. 2.5 MILE BERTH REQUESTED.
- 82Cable ops·HYDROPAC 1972/052005-11-24 07:09Z → cancelled 2005-11-30 05:23ZSeismic survey in progress until further notice by M/V pacific sword towing two meter long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO METER LONG CABLE IN AREA BETWEEN 20-12S 20-36S AND 116-10E 116-40E. FOUR MILE BERTH REQUESTED.
- 83Cable ops·HYDROPAC 2041/052005-12-03 13:51Z → cancelled 2005-12-07 13:17ZSeismic survey in progress until further notice by M/V pacific sword towing two mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO MILE LONG CABLE IN AREA BETWEEN 21-06S 21-18S AND 115-00E 115-10E. FOUR MILE BERTH REQUESTED.
- 84Cable ops·HYDROPAC 2079/052005-12-07 17:17Z → cancelled 2005-12-12 17:06ZSeismic survey in progress until further notice by M/V pacific sword towing 2.5 mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 2.5 MILE LONG CABLE IN AREA BETWEEN 21-53S 22-05S AND 114-08E 114-15E. FOUR MILE WIDE BERTH REQUESTED.
- 85Cable ops·HYDROPAC 2118/052005-12-12 17:06Z → cancelled 2006-01-09 07:27ZSeismic survey in progress until further notice by M/V pacific sword towing two three mile long cables in…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO THREE MILE LONG CABLES IN AREA BETWEEN 12-30S 13-30S AND 124-00E 125-00E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 2079/05.
- 86Cable ops·HYDROPAC 44/062006-01-09 07:27Z → cancelled 2006-02-05 03:53ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BETWEEN 12-48S 13-07S AND 124-20E 124-37E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 2118/05.
- 87Cable ops·HYDROPAC 237/062006-02-11 21:05Z → cancelled 2006-03-09 07:00ZSeismic survey in progress until further notice by M/V pacific sword towing two three mile long cables in…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING TWO THREE MILE LONG CABLES IN AREA BETWEEN 12-00S 13-30S AND 124-00E 125-00E. WIDE BERTH REQUESTED.
- 88Cable ops·HYDROPAC 400/062006-03-10 01:36Z → cancelled 2006-03-17 12:57ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BETWEEN 12-30S 14-30S AND 121-00E 123-00E. WIDE BERTH REQUESTED.
- 89Cable ops·HYDROPAC 2541/062006-12-27 09:32Z → cancelled 2007-01-15 13:14ZSeismic survey in progress until further notice by M/V pacific sword towing 4000 meter long cable in area…Timor Sea
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 4000 METER LONG CABLE IN AREA BOUND BY 11-34S 125-02E, 11-38S 125-05E, 11-41S 125-00E, 11-37S 124-57E. FIVE MILE BERTH REQUESTED.
- 90Cable ops·HYDROPAC 2550/062006-12-28 02:42Z → cancelled 2007-01-16 00:37ZSeismic survey in progress until further notice by M/V pacific sword towing 4000 meter long cable in area…Timor Sea
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING 4000 METER LONG CABLE IN AREA BOUND BY 11-34S 125-02E, 11-38S 125-05E, 11-41S 125-00E, 11-37S 124-57E. WIDE BERTH REQUESTED.
- 91Cable ops·HYDROPAC 215/072007-02-02 03:51Z → cancelled 2007-02-05 09:30ZSeismic survey in progress until further notice by M/V pacific sword towing four mile long cable in area…
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING FOUR MILE LONG CABLE IN AREA BETWEEN 18-34S 21-08S AND 111-40E 112-00E. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 213/07 DTG 020133Z FEB, MSG PROMULGATED IN ERROR. - 92Cable ops·HYDROPAC 264/072007-02-10 18:45Z → cancelled 2007-10-17 11:29ZSeismic survey in progress until further notice by M/V pacific sword towing cable vicinity 21-29S 114-00EIndian Ocean
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD TOWING CABLE VICINITY 21-29S 114-00E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 215/07.
- 93Cable ops·HYDROPAC 1800/072007-10-17 11:29Z → cancelled 2007-11-28 00:00ZSeismic survey in progress until 27 nov by M/V pacific sword towing eight 1000 meter long cables in area…South China Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 27 NOV BY M/V PACIFIC SWORD TOWING EIGHT 1000 METER LONG CABLES IN AREA BOUND BY 10-46.6N 117-58.2E, 10-24.7N 118-44.8E, 09-12.2N 117-38.2E, 09-16.3N 117-30.1E, 09-51.5N 117-30.1E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 264/07. 3. CANCEL THIS MSG 28 NOV.
- 94Cable ops·HYDROPAC 2298/072007-12-31 15:42Z → cancelled 2008-04-26 08:50ZSeismic survey 01 jan thru 31 may 08 by M/V pacific sword towing two 5100 meter long cables in area bound by…Arabian Sea
1. SEISMIC SURVEY 01 JAN THRU 31 MAY 08 BY M/V PACIFIC SWORD TOWING TWO 5100 METER LONG CABLES IN AREA BOUND BY 20-30.33N 071-46.12E, 20-45.92N 071-46.12E, 20-52.82N 071-53.12E, 20-53.12N 072-10.52E, 20-46.54N 072-10.52E, 20-39.49N 072-03.06E. FIVE MILE BERTH REQUESTED. 2. CANCEL THIS MSG 01 JUN 08.
- 95Cable ops·HYDROPAC 2187/082008-11-05 12:44Z → cancelled 2008-11-23 07:45ZSeismic survey in progress until further notice by M/V pacific sword in area between 19-28S 20-36S and…
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD IN AREA BETWEEN 19-28S 20-36S AND 112-52E 113-38E. SIX MILE BERTH REQUESTED.
- 96Surveys·HYDROPAC 2298/082008-11-23 07:45Z → cancelled 2009-03-20 09:00ZSurvey operations in progress until further notice by M/V pacific sword in area between 20-40S 23-40S and…
1. SURVEY OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC SWORD IN AREA BETWEEN 20-40S 23-40S AND 112-00E 113-55E. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 2187/08.
- 97Cable ops·HYDROPAC 733/092009-04-12 10:23Z → cancelled 2009-04-30 12:05ZSeismic survey in progress until 30 jun by M/V pacific sword towing two 2500 meter long cables in area bound…Arabian Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 30 JUN BY M/V PACIFIC SWORD TOWING TWO 2500 METER LONG CABLES IN AREA BOUND BY 20-31.00N 071-40.00E, 20-41.90N 071-50.49E, 20-37.52N 071-50.62E, 20-35.00N 071-40.00E. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 01 JUL.
- 98Cable ops·HYDROPAC 846/092009-04-30 12:05Z → cancelled 2009-07-01 00:00ZSeismic survey in progress until 30 jun by M/V pacific sword towing two 2.5 mile long cables in area bound…Arabian Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 30 JUN BY M/V PACIFIC SWORD TOWING TWO 2.5 MILE LONG CABLES IN AREA BOUND BY 20-49.06N 071-26.75E, 21-02.35N 071-48.86E, 21-02.51N 072-01.99E, 20-58.51N 072-01.86E, 20-51.91N 071-51.08E, 20-38.00N 071-51.15E, 20-30.00N 071-38.60E, 20-30.06N 071-28.03E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 733/09. 3. CANCEL THIS MSG 01 JUL.
- 99Cable ops·HYDROPAC 1274/092009-07-15 06:06Z → cancelled 2009-08-20 05:53ZSeismic survey in progress until further notice by M/V veritas and M/V pacific sword in area bound by…Sulu Sea
SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V VERITAS AND M/V PACIFIC SWORD IN AREA BOUND BY 07-06-30.4N 117-45-44.9E, 07-10-35.4N 118-10-12.0E, 08-21-29.3N 118-02-24.8E, 08-28-03.1N 117-29-30.4E, 08-01-36.8N 117-23-27.2E.
- 100Cable ops·HYDROPAC 1481/092009-08-20 05:53Z → cancelled 2009-09-07 00:00ZSeismic survey in progress until 06 sep by M/V veritas and M/V pacific sword in area bound by 11-43-34N…Sulu Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 06 SEP BY M/V VERITAS AND M/V PACIFIC SWORD IN AREA BOUND BY 11-43-34N 121-08-52E, 11-53-23N 121-48-35E, 11-37-16N 121-52-38E, 11-27-02N 121-13-05E. 2. CANCEL HYDROPAC 1274/09. 3. CANCEL THIS MSG 07 SEP.
- 101Cable ops·HYDROPAC 1975/092009-10-30 07:55Z → cancelled 2009-11-16 06:50ZSeismic survey in progress until 26 nov by M/V pacific sword towing two 2.5 mile long cables in area bound…Arabian Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 26 NOV BY M/V PACIFIC SWORD TOWING TWO 2.5 MILE LONG CABLES IN AREA BOUND BY 20-35.3N 071-27.8E, 20-41.3N 071-27.4E, 21-02.2N 072-00.9E, 20-59.1N 072-01.9E, 20-52.1N 071-50.9E, 20-49.7N 071-50.9E. FIVE MILE BERTH REQUESTED. 2. CANCEL THIS MSG 27 NOV.
- 102Cable ops·HYDROPAC 2112/092009-11-16 06:50Z → cancelled 2009-12-16 00:01ZSeismic survey 19 nov thru 15 dec by M/V pacific sword towing two 2.5 mile long cables in area bound by…Arabian Sea
1. SEISMIC SURVEY 19 NOV THRU 15 DEC BY M/V PACIFIC SWORD TOWING TWO 2.5 MILE LONG CABLES IN AREA BOUND BY 20-44.9N 071-27.1E, 20-41.3N 071-27.4E, 21-02.2N 072-00.9E, 21-02.2N 071-54.7E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1975/09. 3. CANCEL THIS MSG 16 DEC.
- 103Cable ops·HYDROPAC 2381/092009-12-18 17:52Z → cancelled 2010-01-18 00:01ZSeismic survey in progress until 17 jan 10 by M/V pacific sword towing two 2.5 mile long cables in area…Arabian Sea
1. SEISMIC SURVEY IN PROGRESS UNTIL 17 JAN 10 BY M/V PACIFIC SWORD TOWING TWO 2.5 MILE LONG CABLES IN AREA BOUND BY 20-44.9N 071-27.1E, 20-48.6N 071-26.8E, 21-02.3N 071-48.6E, 21-02.3N 071-54.7E. FIVE MILE BERTH REQUESTED. 2. CANCEL THIS MSG 18 JAN 10.
- 104Cable ops·HYDROPAC 308/102010-02-16 06:52Z → cancelled 2010-03-01 01:00ZSeismic survey in progress until 28 feb by M/V pacific sword towing two 5100 meter long cables in area bound…India-east Coast · Bay of Bengal
INDIA-EAST COAST. 1. SEISMIC SURVEY IN PROGRESS UNTIL 28 FEB BY M/V PACIFIC SWORD TOWING TWO 5100 METER LONG CABLES IN AREA BOUND BY 16-12N 081-30E, 16-07N 081-37E, 16-07N 081-30E. FOUR MILE BERTH REQUESTED. 2. CANCEL THIS MSG 01 MAR.
- 105Cable ops·HYDROPAC 378/102010-02-27 03:14Z → cancelled 2010-04-15 00:01ZSeismic survey by M/V pacific sword towing two 5100 meter long cables: a. in progress until 03 mar in area…India-east Coast · Bay of Bengal
INDIA-EAST COAST. 1. SEISMIC SURVEY BY M/V PACIFIC SWORD TOWING TWO 5100 METER LONG CABLES: A. IN PROGRESS UNTIL 03 MAR IN AREA BOUND BY 16-13.23N 081-29.59E, 16-09.38N 081-37.27E, 16-07.58N 081-31.16E, 16-08.36N 081-29.59E. B. 04 THRU 17 MAR IN AREA BOUND BY 16-17.53N 081-23.00E, 16-11.15N 081-43.10E, 16-09.38N 081-37.27E, 16-13.23N 081-29.59E. C. 18 THRU 31 MAR IN AREA BOUND BY 16-17.53N 081-23.00E, 16-15.09N 081-39.54E, 16-15.14N 081-41.44E, 16-12.15N 081-47.28E, 16-11.15N 081-43.10E. D. 01 THRU 14 APR IN AREA BOUND BY 16-15.14N 081-41.44E, 16-15.14N 081-52.07E, 16-14.38N 081-53.15E, 16-14.00N 081-53.17E, 16-12.20N 081-47.28E. FOUR MILE BERTH REQUESTED. 2. CANCEL THIS MSG 15 APR. - 106Cable ops·HYDROPAC 806/102010-04-19 11:53Z → cancelled 2010-05-17 00:01ZSeismic survey by M/V pacific sword towing two 5100 meter long cables: a. in progress until 26 apr in area…Bay of Bengal · India-east Coast · Bay of Bengal
BAY OF BENGAL. INDIA-EAST COAST. 1. SEISMIC SURVEY BY M/V PACIFIC SWORD TOWING TWO 5100 METER LONG CABLES: A. IN PROGRESS UNTIL 26 APR IN AREA BOUND BY 16-11.01N 081-42.28E, 16-17.20N 081-30.00E, 16-18.39N 081-29.99E, 16-18.00N 081-33.33E, 16-11.94N 081-45.71E. B. 27 APR THRU 07 MAY IN AREA BOUND BY 16-18.00N 081-33.33E, 16-17.96N 081-34.66E, 16-15.25N 081-39.88E, 16-15.25N 081-46.08E, 16-13.17N 081-50.19E, 16-11.94N 081-45.72E. C. 08 AND 09 MAY IN AREA BOUND BY 15-16.26N 081-50.97E, 16-15.26N 081-52.06E, 16-14.66N 081-53.25E, 16-14.11N 081-53.25E. D. 10 THRU 16 MAY IN AREA BOUND BY 16-15.25N 081-46.08E, 15-16.25N 081-50.97E, 16-14.11N 081-53.25E, 16-13.16N 081-50.20E. FOUR MILE BERTH REQUESTED. 2. CANCEL THIS MSG 17 MAY. - 107Cable ops·HYDROPAC 1049/102010-05-21 01:26Z → cancelled 2010-06-01 17:20ZSeismic survey in progress until 02 jun by M/V pacific sword towing two 5100 meter long cables in area bound…India-east Coast · Bay of Bengal
INDIA-EAST COAST. 1. SEISMIC SURVEY IN PROGRESS UNTIL 02 JUN BY M/V PACIFIC SWORD TOWING TWO 5100 METER LONG CABLES IN AREA BOUND BY 16-10.20N 081-56.80E, 16-17.29N 081-51.42E, 16-15.80N 081-45.50E, 16-18.93N 081-32.10E, 16-18.64N 081-29.35E, 16-16.90N 081-29.35E, 16-16.85N 081-32.06E. FOUR MILE BERTH REQUESTED. 2. CANCEL THIS MSG 03 JUN.
- 108Cable ops·HYDROPAC 1139/102010-06-01 17:20Z → cancelled 2010-06-16 00:01ZSeismic survey in progress until 15 jun by M/V pacific sword towing two 5100 meter long cables in area bound…India-east Coast · Bay of Bengal
INDIA-EAST COAST. 1. SEISMIC SURVEY IN PROGRESS UNTIL 15 JUN BY M/V PACIFIC SWORD TOWING TWO 5100 METER LONG CABLES IN AREA BOUND BY 16-18.59N 081-32.36E, 16-10.00N 081-50.10E, 16-11.15N 081-54.43E, 16-15.58N 081-45.32E. FOUR MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1049/10. 3. CANCEL THIS MSG 16 JUN.
Not for navigation. The name is read automatically from official navigational warnings; a common name can belong to more than one ship, and a message may describe work the vessel is doing (cable, survey) rather than something that happened to it. Mariners must use official NAVAREA broadcasts and their national MSI service.