Cable ops
Seismic survey in progress until 250300Z jul by M/V thales venturer towing 15 meter long cable in area bound…
HYDROLANT 1421/03
- issued
- 2003-07-24 05:20Z
- status
- cancelled 2003-07-25 04:00Z (archive)
- self-cancels
- 2003-07-25 04:00Z
- cancels
- HYDROLANT 1798/01HYDROLANT 1386/03
- authority
- NAVAREA V 869/03 240400Z JUL 03; WZ 956/03 240317Z JUL 03; UK HYDROGRAPHIC OFFICE 23 JUL 03
- sea
- South Atlantic Ocean
- position
- -23.510, -43.204
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 250300Z JUL BY M/V THALES VENTURER TOWING 15 METER LONG CABLE IN AREA BOUND BY 23-14.2S 043-33.1W, 23-28.0S 042-46.4W, 23-49.3S 042-57.3W, 23-28.6S 043-38.5W. TEN MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 1798/01(37), WRECK REMOVED. 3. CANCEL HYDROLANT 1386/03(37), OPERATIONS COMPLETED. 4. CANCEL THIS MSG 250400Z JUL.
This area · cable & pipeline work
2099 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations in progress until 30 mar 24 by cableship durable in: a. 24-05.68S 046-30.76W2023-12-27
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic survey in progress until 09 oct by M/V sw diamond towing nine 225 meter long cables in area bound by…2022-10-07
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Underwater operations in progress until 132300Z jul by cableship ile de brehat in: a. 24-03.8S 046-29.2W2017-06-15
- Seismic survey 21 thru 28 jan by M/V polarcus adira towing 9000 meter long cable in area bound by 25-06S…2017-01-19
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Dangerous wreck, least depth 11.7 meters, in 51-28.7N 001-23.9Ecancels · 2001-06-21
- Underwater operations in progress until further notice by cableship maersk defender displaying RACON (d)…cancels · 2003-07-18
- Dangerous wreck, least depth 11.7 meters, in 51-28.7N 001-23.9Ereplaced · 2001-06-21
- Underwater operations in progress until further notice by cableship maersk defender displaying RACON (d)…replaced · 2003-07-18
Nearby now · within 120 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.