Cable ops
Seismic survey in progress until 280259Z jul by M/V nps veritas viking towing eight 3.5 mile long cables in…
Brazil-southeast Coast · HYDROLANT 1673/12
- issued
- 2012-07-24 01:07Z
- status
- cancelled 2012-07-28 03:59Z (archive)
- self-cancels
- 2012-07-28 03:59Z
- cancels
- HYDROLANT 1650/12HYDROLANT 1660/12
- authority
- NAVAREA V S 981/12 23 JUL 12 - NAVAREA V N 974/12 23 JUL 12.
- position
- -24.032, -41.047
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-SOUTHEAST COAST. 1. SEISMIC SURVEY IN PROGRESS UNTIL 280259Z JUL BY M/V NPS VERITAS VIKING TOWING EIGHT 3.5 MILE LONG CABLES IN AREA BOUND BY 24-15S 042-02W, 23-59S 041-26W, 23-45S 041-11W, 23-37S 040-54W, 23-50s 041-18W, 24-14S 040-17W. 2. CANCEL HYDROLANT 1650/12, 1660/12. 3. CANCEL THIS MSG 280359Z JUL 12.
This area · cable & pipeline work
2332 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
23
- Cable operations in progress thru 03 jan 24 by M/V puerto real in area bound by 24-31.30S 042-12.30W,…2023-06-23
- Seismic survey in progress until 09 oct by M/V sw diamond towing nine 225 meter long cables in area bound by…2022-10-07
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Underwater operations in progress until 132300Z jul by cableship ile de brehat in: a. 24-03.8S 046-29.2W2017-06-15
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by oceanic champion towing 12 8000 meter cables in area bound by 25-33.47S…2017-01-10
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until 280259Z jul by M/V nps veritas viking towing eight 3.5 mile long cables in…cancels · 2012-07-21
- Derelict F/V talita adrift in 00-58S 043-47W at 211100Z julcancels · 2012-07-22
- Seismic survey in progress until 280259Z jul by M/V nps veritas viking towing eight 3.5 mile long cables in…replaced · 2012-07-21
- Derelict F/V talita adrift in 00-58S 043-47W at 211100Z julreplaced · 2012-07-22
Nearby now · within 120 nm
- Hazardous operations 0800Z to 2100Z daily 18 thru 20 aug in area within ten miles of 25-06.00S 041-13.00WExercises · 64.8 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 72.1 nm
- Hazardous operations in progress until 060400Z jun 27 in area bound by 24-39.87S 042-29.30W, 24-39.78S…Exercises · 88 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 96.1 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 101.4 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 105.4 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 119.5 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 119.6 nm
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.