Cable ops
Seismic survey in progress until 280259Z may by M/V ocean europe and M/V sanco star in area bound by…
HYDROLANT 925/09
- issued
- 2009-05-20 14:07Z
- status
- cancelled 2009-05-28 03:59Z (archive)
- self-cancels
- 2009-05-28 03:59Z
- cancels
- HYDROLANT 401/09
- authority
- NAVAREA V E 1058/09 201005Z MAY 09; NAVAREA V 1046/09 20 MAY 09; WZ 599/09 200918Z MAY 09; WZ 600/09 201100Z MAY 09; WZ 601/09 201142Z MAY 09.
- sea
- South Atlantic Ocean
- position
- -22.207, -39.645
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 280259Z MAY BY M/V OCEAN EUROPE AND M/V SANCO STAR IN AREA BOUND BY 22-23.55S 040-03.03W, 22-11.20S 039-42.53W, 22-13.03S 039-41.57W, 22-09.40S 039-37.82W, 22-03.32S 039-12.62W. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 401/09(36), 890/09(36,37), 903/09(35), 908/09. 3. CANCEL THIS MSG 280359Z MAY.
This area · cable & pipeline work
1535 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic survey in progress until 15 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-08
- Seismic survey in progress until 08 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-01
- Seismic survey 17 thru 24 sep by M/V bgp challenger towing 12000 meter long cable in area bound by 25-07S…2016-09-16
- Brazil-southeast coast DNC 012016-08-11
- Seismic survey in progress until 23 apr by nps sigma in area bound by 21-10.6S 039-55.5W, 21-10.5S…2016-04-12
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Nga chart 36025 (1ST ed)cancels · 2009-02-25
- Nga chart 36025 (1ST ed)replaced · 2009-02-25
- Nga chart 36049 (0 ed)replaced · 2009-05-15
- Nga chart 35078 (2ND ed)replaced · 2009-05-15
- Last known position vicinity recife (08-03S 034-54W)replaced · 2009-05-16
Nearby now · within 120 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 21.6 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 43.6 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 44.1 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 45.3 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 64.5 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 66.8 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 68.7 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 71.4 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 78.9 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 88.1 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 91.1 nm
- Underwater operations 1100Z to 2100Z daily 13 thru 22 aug by M/V comando b and M/V am kirti in 20-23.90S…Surveys · 112.3 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.