Cable ops
Seismic survey in progress until 25 dec by M/V cgg amadeus M/V bravo supporter, M/V sarah and M/V shamrock…
HYDROPAC 1099/05
- issued
- 2005-07-11 07:50Z
- status
- cancelled 2005-08-06 09:34Z (archive)
- cancels
- HYDROPAC 688/05
- authority
- MENAS 36/05 11 JUL 05.
- sea
- Persian Gulf
- position
- 26.803, 52.135
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 25 DEC BY M/V CGG AMADEUS M/V BRAVO SUPPORTER, M/V SARAH AND M/V SHAMROCK VICTORY IN AREA BOUND BY 26-57.0N 051-41.5E, 26-19.0N 052-26.1E, 27-00.0N 052-20.7E, 27-05.5N 052-10.0E, 27-05.0N 051-56.5E. 2. CANCEL HYDROPAC 688/05. 3. CANCEL THIS MSG 26 DEC.
This area · cable & pipeline work
166 within 180 nm since 1999 · 1 in the last 12 months · 1 in force now
99
00
05
10
15
20
25
26
- Pipeline operations 10 aug thru 10 nov by vessel barge derrick barge 30 in area bound by 26-31.70N…2026-08-09
- Cable operations 08 jan until further notice along trackline joining 26-11.18N 050-39.25E, 26-12.03N…2024-01-07
- Pipeline operations in progress thru 31JUL in area bound by 26-10.03N 050-39.57E, 26-10.05N 050-39.72E,…2024-01-05
- Pipeline operations in progress until further notice by M/V DLB-750 along trackline joining 24-47.13N…2023-10-15
- Cable operations in progress until further notice by cableship ccc pioneer along tracklines joining: a.…2023-10-12
- Cable operations in progress until further notice by M/V HALL-1, M/V abs, OCEAN-10 barge, M/V ocean cat and…2023-09-13
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until further notice by M/V cgg amadeus towing eight 7000 meter long cables in…cancels · 2005-04-26
- Seismic survey in progress until further notice by M/V cgg amadeus towing eight 7000 meter long cables in…replaced · 2005-04-26
- Cancel HYDROPAC 1052/05(75), survey completedcancelled by · 2005-08-06
Nearby now · within 120 nm
- Underwater operations in progress until further notice by M/V HYSY289 in area bound by 26-41.99N 051-53.26E,…Surveys · 13 nm
- Wave rider buoy, fl 5 y 10 sec, temporarily established in 26-39.57N 051-57.22ENav aids · 13 nm
- Bh jacket light fl(r) 4 sec temporarily established in 26-38.41N 051-56.90ENav aids · 14 nm
- Mooring buoy established in 26-38.47N 051-55.82ENav aids · 14.6 nm
- Pipeline operations 10 aug thru 10 nov by vessel barge derrick barge 30 in area bound by 26-31.70N…Cable ops · 23.4 nm
- Survey operations in progress until further notice by M/V halul 41 in area bound by 26-23.34N 051-47.10E,…Surveys · 40.4 nm
- Survey operations in progress until 05 sep by M/V furgo proteus in areas bound by: a. 26-33.34N 051-03.56E,…Surveys · 49.2 nm
- Foul ground, anchor with 2.5 shackle chain reported in 25-07.69N 052-53.09EWrecks · 108.4 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.