Cable ops
Seismic survey in progress until 31 oct by M/V ramform victory and M/V seagood cassandra 2 towing 12 6000…
HYDROPAC 1370/07
- issued
- 2007-08-07 07:40Z
- status
- cancelled 2007-09-13 14:04Z (archive)
- cancels
- HYDROPAC 1308/07
- authority
- NAVAREA XIII 56/07 06 NOV 07.
- position
- 58.047, 155.713
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 31 OCT BY M/V RAMFORM VICTORY AND M/V SEAGOOD CASSANDRA 2 TOWING 12 6000 METER LONG CABLES IN AREA BOUND BY 57-45N 155-13E, 58-02N 154-58E, 58-21N 156-12E, 58-03N 156-27E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 1308/07. 3. CANCEL THIS MSG 01 NOV.
This area · cable & pipeline work
13 within 180 nm since 2004 · 0 in the last 12 months · 0 in force now
04
05
10
15
- Seismic survey in progress until 10 oct by M/V fa xian 6 towing twelve 6000 meter long cables in area bound…2015-09-21
- Seismic survey 25 jun thru 10 aug by M/V fa XIAN6 towing twelve 6000 meter long cables in area bound by…2015-06-21
- Cable operations 25 may thru 20 sep along tracklines joining: a. 53-29.11N 143-06.41E, 53-45.00N 144-40.00E,…2014-05-21
- Seismic survey 27 jul thru 31 oct by M/V orient explorer towing 8500 meter long cable in area bound by…2013-07-26
- Seismic survey in progress until 30 nov by M/V professor polshkov towing 6000 meter long cable in area bound…2010-10-22
- Seismic survey in progress until 31 oct by M/V professor polshkov towing 6000 meter long cable in area bound…2010-09-05
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey 020001Z to 110001Z aug by M/V ramform victory towing twelve 5400 meter long cables in area…cancels · 2007-07-28
- Seismic survey 020001Z to 110001Z aug by M/V ramform victory towing twelve 5400 meter long cables in area…replaced · 2007-07-28
- Seismic survey in progress until 31 oct by M/V ramform victory and M/V seagood cassandra 2 towing 12 6000…cancelled by · 2007-09-13
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.