Cable ops
Seismic survey in progress until 30 apr by vessel towing 6000 meter long cable in area bound by 18-55.0N…
South China Sea · HYDROPAC 997/14
- issued
- 2014-04-08 11:13Z
- status
- cancelled 2014-05-01 00:01Z (archive)
- authority
- NAVAREA XI 261/14 081046Z APR 14.
- position
- 18.726, 111.219
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
SOUTH CHINA SEA. 1. SEISMIC SURVEY IN PROGRESS UNTIL 30 APR BY VESSEL TOWING 6000 METER LONG CABLE IN AREA BOUND BY 18-55.0N 111-15.0E, 18-53.0N 111-24.6E, 18-44.2N 111-30.2E, 18-33.5N 111-11.6E, 18-36.9N 110-58.0E, 18-48.0N 110-58.0E, 18-48.0N 111-15.0E. 2. CANCEL THIS MSG 01 MAY 14.
This area · cable & pipeline work
24 within 180 nm since 2001 · 0 in the last 12 months · 0 in force now
01
05
10
15
- Seismic survey in progress until 31 oct by vessel towing six 6000 meter long cables in area bound by 19-30N…2015-08-24
- Seismic survey in progress until 20 sep by vessel towing ten 6000 meter long cables in area bound by 18-22N…2015-08-24
- Seismic survey in progress until 30 aug by vessel towing six 6000 meter long cables in area bound by 17-46N…2015-07-28
- Seismic survey in progress until 25 nov by vessel towing 12 6000 meter long cables in area bound by 17-51.9N…2014-10-17
- Seismic survey in progress until 23 sep by vessel towing twelve 6000 meter long cables in area bound by…2014-09-18
- Seismic survey in progress until 15 jun by vessel towing twelve 6000 meter long cables in area bound by…2014-04-28
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.