Underwater operations in progress until 01 sep by cableship it integrity in vicinity: a. 54-16.70N 165-54.60W
Bering Sea · NAVAREA XII 618/22
What this record establishes
Archived notice · 2022-09-02 00:01Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · IT INTEGRITY 0/22 270900Z AUG 22.. Issued 2022-08-27 11:45Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Bering Sea. The parsed report position is 54.482, -164.411. It is a position in the source message, not a live location. Check the original wording for limits and qualifications.
- issued
- 2022-08-27 11:45Z
- status
- Archived notice
- self-cancels
- 2022-09-02 00:01Z
- authority
- IT INTEGRITY 0/22 270900Z AUG 22.
- NAVAREA
- NAVAREA XII
- issued by
- IT INTEGRITY
- sea
- Bering Sea
- position
- 54.482, -164.411
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
BERING SEA. NORTH PACIFIC. ALASKA. 1. UNDERWATER OPERATIONS IN PROGRESS UNTIL 01 SEP BY CABLESHIP IT INTEGRITY IN VICINITY: A. 54-16.70N 165-54.60W. B. 54-41.10N 162-54.70W. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 020001Z SEP 22.
Reading this warning
- Underwater operations
- Divers or remotely operated vehicles are working below a vessel that cannot easily move out of the way.
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
- Date-time group (DTG)
- A compact UTC timestamp — day, hour and minute followed by Z — such as 201500Z for the 20th at 15:00 UTC.
Collected reports in this area · cable & pipeline work
6 within 180 nm since 2022 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations in progress until further notice by cableship it intrepid along trackline joining 55-20.50N…2022-08-30
- Cable operations in progress until 260800Z aug by cableship it intrepid along trackline joining 55-24.70N…2022-08-24
- Cable operations in progress until further notice by cableship it intrepid along trackline joining 55-09.00N…2022-08-20
- Cable operations in progress until further notice by cableship it intrepid along trackline joining 54-08.00N…2022-08-02
- Cable operations in progress until further notice by cableship it intrepid along trackline joining 53-54.90N…2022-07-26
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-10-03 09:28Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.