Cable operations in progress until 161200Z jan by cableship peter faber in vicinity 39-58.2N 048-23.9W
North Atlantic Ocean · NAVAREA IV 16/19
What this record establishes
Archived notice · 2019-01-16 13:00Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · C/S PETER FABER 082259Z JAN 19.. Issued 2019-01-08 23:08Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- North Atlantic Ocean. The parsed report position is 39.970, -48.398. It is a position in the source message, not a live location. Check the original wording for limits and qualifications.
Current notices and reporting history in the North Atlantic Ocean →
- issued
- 2019-01-08 23:08Z
- status
- Archived notice
- self-cancels
- 2019-01-16 13:00Z
- authority
- C/S PETER FABER 082259Z JAN 19.
- NAVAREA
- NAVAREA IV
- issued by
- C/S PETER FABER
- sea
- North Atlantic Ocean
- position
- 39.970, -48.398
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
WESTERN NORTH ATLANTIC. 1. CABLE OPERATIONS IN PROGRESS UNTIL 161200Z JAN BY CABLESHIP PETER FABER IN VICINITY 39-58.2N 048-23.9W. ONE MILE WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 161300Z JAN 19.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Date-time group (DTG)
- A compact UTC timestamp — day, hour and minute followed by Z — such as 201500Z for the 20th at 15:00 UTC.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
Collected reports in this area · cable & pipeline work
18 within 180 nm since 2000 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations by M/V layla: a. in progress until 8 may within five miles of trackline joining 40-04.00N…2024-05-07
- Cable operations 14 sep until further notice by cableship layla in area bound by 38-24.80N 048-05.77W,…2023-09-12
- Cable operations in progress until 222359Z aug by M/V rebecca along tracklines joining: a. 44-11.08N…2022-08-16
- Cable operations 280600Z jun to 162359Z aug by M/V rebecca along tracklines joining: a. 44-27.76N…2022-06-26
- Cable operations in progress until further notice by cableship lida in 40-24N 045-36W2020-09-28
- Cable operations in progress until further notice by cableship ile de aix in 39-56.7N 048-30.3W2018-11-28
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
24 cable & pipeline work listed in force · see all
Record snapshot 2026-10-02 08:34Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.