Cable ops
Pipeline operations are in progress in the North Atlantic through December 31, 2026, by multiple vessels; wide berth is requested.
North Atlantic · NAVAREA IV 7/26
- issued
- 2026-01-02 22:29Z
- status
- in force
- self-cancels
- 2027-01-01 00:01Z
- position
- 8.060, -56.880
- source
- nga_inforce · first seen 2026-08-17 13:41Z
Original warning text
NORTH ATLANTIC.
1. PIPELINE OPERATIONS IN PROGRESS THRU 31 DEC 26
BY THE FOLLOWING VESSELS: C-CONFIDENCE, C- INSTALLER,
CLARENCE TRICHE, GUYANA HERO, HORN ISLAND, MADAM KALINA
PARADISE ISLAND, RUSSELL ADAMS, SANIBEL ISLAND, TED SMITH,
WINE ISLAND, RUSSELL BOUZIGA, A’RINRA
IN AREAS BOUND BY:
A. 08-00.66N 056-44.58W, 08-00.66N 056-40.12W,
07-54.87N 056-40.12W, 07-54.87N 056-44.58W.
B. 08-15.96N 057-02.23W, 08-15.96N 056-54.25W,
07-58.60N 056-54.25W, 07-58.60N 057-02.23W.
C. 08-06.94N 056-49.93W, 08-06.94N 056-46.61W,
07-58.94N 056-46.61W, 07-58.94N 056-49.93W.
D. 08-03.09N 056-46.93W, 08-03.09N 056-43.66W,
07-56.58N 056-43.67W, 07-56.57N 056-38.77W,
07-51.15N 056-38.77W, 07-51.15N 056-46.94W.
2. WIDE BERTH REQUESTED.
3. CANCEL THIS MSG 010001Z JAN 27.Conditions at the position · now
loading…
Open-Meteo Marine / Open-Meteo · GEBCO 2020 · model data at the centroid, not an observation
This area · cable & pipeline work
44 within 180 nm since 2001 · 2 in the last 12 months · 2 in force now
01
05
10
15
20
25
26
- Pipeline operations in progress until 31 dec by M/V saipem constellation in area bound by 08-07.37N…2026-07-05
- Pipeline operations 01 apr thru 30 sep by M/V seven borealis along trackline joining 07-59.27N 057-01.00W,…2024-03-27
- Cable operations 06 mar thru 02 apr by cableship pierre de fermat along tracklines joining: a. 08-07.10N…2024-03-05
- Pipeline operations in progress until 31 aug by barge tamuata and barge stingray in area bound by 07-06.92N…2024-02-27
- Cable operations in progress until 15 mar by cableship pierre de fermat along tracklines joining: a.…2024-02-21
- Cable operations in progress thru 15 mar 24 by cableship pierre de fermat along tracklines joining a.…2024-02-15
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
- Pipeline operations in progress until 31 dec by M/V saipem constellation in area bound by 08-07.37N…Cable ops · 1.6 nm
- Underwater operations in progress until further notice by M/V bourbon calm and M/V bourbon sapphire in areas…Surveys · 2.6 nm
- Underwater operations in progress until 31 dec 26 by osv aldemir souza tide in area bound by 08-15.96N…Surveys · 6.5 nm
- Underwater operations in progress until 31 dec by M/V c-worker 1 in area bound by 07-54.85N 057-06.47W,…Surveys · 6.7 nm
- Underwater operations in progress until 31 dec by vessel ocv normand navigator in area bound by 08-00.65N…Surveys · 11.9 nm
- Underwater operations in progress until 31 dec by M/V prinsengracht in area bound by 08-03.09N 056-46.88W,…Surveys · 12.6 nm
- Survey operations in progress until 31 dec 26 by M/V fugro brasilis in area bound by: 08-00.00N 057-09.90W,…Surveys · 13.5 nm
- Survey operations in progress until 31 dec 26 by vessel bos princess in area bound by 08-09.73N 057-09.73W,…Surveys · 14.9 nm
- Underwater operations in progress until 25 aug by M/V handin tide in area bound by 08-00.65N 056-59.52W,…Surveys · 17.1 nm
- Survey operations in progress until 15 nov by M/V moonrise g in area bound by 07-50.19N 058-24.50W,…Surveys · 63.5 nm
- Survey operations in progress until 15 nov by M/V bgp prospector in area bound by 07-50.19N 058-24.50W,…Surveys · 63.5 nm
- Underwater operations 01 jun thru 31 aug by M/V normand navigator in area bound by 07-28.00N 056-00.00W,…Surveys · 70.5 nm
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →