Cable ops
Seismic survey in progress until 250259Z jun by M/V cgg harmattan towing eight 6000 meter long cables in…
HYDROLANT 1378/02
- issued
- 2002-06-21 06:40Z
- status
- cancelled 2002-06-25 03:59Z (archive)
- self-cancels
- 2002-06-25 03:59Z
- cancels
- HYDROLANT 1377/02
- authority
- NAVAREA V 759/02 210401Z JUN 02; WZ 971/02 210928Z JUN 02
- sea
- South Atlantic Ocean
- position
- -22.298, -40.204
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 250259Z JUN BY M/V CGG HARMATTAN TOWING EIGHT 6000 METER LONG CABLES IN AREA BOUND BY 22-02S 040-24W, 22-13S 040-33W, 22-34S 039-59W, 22-23S 039-52W. FOUR MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 1377/02(36), AID RESTORED. 3. CANCEL THIS MSG 250359Z JUN.
This area · cable & pipeline work
1678 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey 31 dec thru 07 jan 17 by M/V oceanic champion towing 12 7408 meter long cables in area bound…2016-12-30
- Seismic survey in progress until 15 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-08
- Seismic survey in progress until 08 oct by M/V bgp challenger towing 12000 meter long cable in area bound by…2016-10-01
- Seismic survey 17 thru 24 sep by M/V bgp challenger towing 12000 meter long cable in area bound by 25-07S…2016-09-16
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Mull of galloway light 54-38.1N 004-51.4W unreliablecancels · 2002-06-21
- Mull of galloway light 54-38.1N 004-51.4W unreliablereplaced · 2002-06-21
Nearby now · within 120 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 10 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 12.7 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 14.8 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 38.7 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 39.6 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 43.7 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 43.8 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 49.6 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 52.5 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 58.3 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 72.8 nm
- Underwater operations 1100Z to 2100Z daily 13 thru 22 aug by M/V comando b and M/V am kirti in 20-23.90S…Surveys · 114.1 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.