Cable ops
Seismic survey in progress until 20 jun by M/V cgg harmattan towing six 6000 meter long cables in area bound…
HYDROLANT 1754/01
- issued
- 2001-06-18 05:50Z
- status
- cancelled 2001-06-18 14:15Z (archive)
- cancels
- HYDROLANT 1712/01HYDROLANT 1748/01
- authority
- NAVAREA V 1044/01 180401Z JUN 01; NAVAREA VI 169/01 171400Z JUN 01; WZ 1300/01 172356Z JUN 01
- sea
- South Atlantic Ocean
- position
- -22.575, -40.440
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 20 JUN BY M/V CGG HARMATTAN TOWING SIX 6000 METER LONG CABLES IN AREA BOUND BY 22-12S 040-45W, 22-35S 039-40W, 22-55S 040-30W, 22-40S 041-00W. FOUR MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 1712/01(23). 3. CANCEL HYDROLANT 1748/01(37), OPERATIONS COMPLETED. 4. CANCEL THIS MSG 21 JUN.
This area · cable & pipeline work
1889 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
21
- Underwater operations 1100Z to 2100Z daily 19 thru 24 apr by cableship intrepid in 20-22.45S 040-11.23W2021-04-18
- Seismic deflector gear adrift in 23-08.50S 042-53.90W at 071300Z sep2019-09-07
- Seismic survey 21 thru 28 jan by oceanic champion towing 12 8000 meter long cables in area bound by…2017-01-19
- Seismic survey 14 thru 21 jan by oceanic champion towing 12 8000 meter cables in area bound by 25-33.47S…2017-01-10
- Seismic survey in progress until 14 jan by oceanic champion towing 12 8000 meter cables in area bound by…2017-01-07
- Seismic survey 31 dec thru 07 jan 17 by M/V oceanic champion towing 12 7408 meter long cables in area bound…2016-12-30
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Punta mogotes light 38-05.6S 057-32.5W range temporarily reduced to 13 milescancels · 2001-06-13
- Underwater operations in progress until further notice by M/V havila reel vicinity 51-02N 004-59Wcancels · 2001-06-17
- Punta mogotes light 38-05.6S 057-32.5W range temporarily reduced to 13 milesreplaced · 2001-06-13
- Underwater operations in progress until further notice by M/V havila reel vicinity 51-02N 004-59Wreplaced · 2001-06-17
- Underwater operations in progress until further notice by M/V neftegaz 31 vicinity of trackline between…cancelled by · 2001-06-18
Nearby now · within 120 nm
- Underwater operations 1000Z to 2000Z daily until 02 nov 26 by M/V fugro vaquita in: a. 22-26.32S 040-25.47WSurveys · 7.9 nm
- Underwater operations in progress until 170259Z aug in 22-22.48S 040-25.05WSurveys · 12.1 nm
- Survey operations in progress until 09 jul 27 by M/V bgp dragon towing 250 meter long cable in area bound by…Surveys · 29.2 nm
- Survey operations 10 aug 26 thru 08 mar 27 by tug mce navegacao I in area bound by 22-48.38S 041-08.21W,…Surveys · 38.8 nm
- Underwater operations in progress until 140001Z nov by M/V fugro vaquita in area bound by 22-03.00S…Surveys · 41.4 nm
- Underwater operations in progress until 312300Z aug by M/V fugro vaquita in area bound by 21-35.43S…Surveys · 42.4 nm
- Underwater operations 281000Z jul to 192100Z aug by M/V umi polaris in area bound by 21-53.65S 040-49.70W,…Surveys · 43.6 nm
- RACON at cabo sao tome light 22-02.52S 041-03.17W off air until 28 sepNav aids · 46.7 nm
- Survey operations in progress until 312200Z aug in area bound by 21-36.17S 041-00.00W, 21-36.05S 040-37.59W,…Surveys · 48.9 nm
- Odas buoy temporarily established until 13 apr 27 in 21-34.20S 040-43.62WNav aids · 62.4 nm
- Barra de itabapoana light 21-18.80S 040-57.90W unlit until 08 sep 26Nav aids · 81.2 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.