Cable ops
Seismic survey in progress until 21 sep in area bound by 04-40S 036-55W, 04-42S 036-50W, 04-39S 036-46W,…
HYDROLANT 1890/02
- issued
- 2002-08-26 06:40Z
- status
- cancelled 2002-08-28 05:10Z (archive)
- cancels
- HYDROLANT 1802/02
- authority
- NAVAREA V 1053/02 260359Z AUG 02; UKMRCC AOR-E EGC#583 241630Z AUG 02
- position
- -4.665, -36.837
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL 21 SEP IN AREA BOUND BY 04-40S 036-55W, 04-42S 036-50W, 04-39S 036-46W, 04-38S 036-49W. WIDE BERTH REQUESTED. 2. CANCEL HYDROLANT 1802/02(GEN), VESSEL LOCATED. 3. CANCEL THIS MSG 22 SEP.
This area · cable & pipeline work
342 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 130259Z feb 21 by cableship ile de brehat and cableship peter faber along…2020-12-30
- Cable operations 300300Z nov to 130259Z feb 21 by cableship ile de brehat along trackline joining 03-44.36S…2020-11-29
- Underwater operations 1000Z to 2000Z daily 10 may thru 20 sep by cableship recorder and M/V saga badejo in…2018-08-10
- Underwater operations 1000Z to 2000Z daily 10 may thru 09 aug by cableship recorder and M/V saga badejo in…2018-05-10
- Seismic survey 19 thru 27 jan by M/V bgp challenger towing 10000 meter long cable in area bound by 04-09S…2017-01-18
- Seismic survey in progress until 26 feb by M/V ramform atlas towing 14 9000 meter long cables in area bound…2016-01-15
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- 12 meter vessel roamer, black hull, one person on board, overdue ascension to falmouthcancels · 2002-08-15
- 12 meter vessel roamer, black hull, one person on board, overdue ascension to falmouthreplaced · 2002-08-15
- Seismic survey in progress until 21 sep by M/V bulldog in area bound by 04-40S 036-55W, 04-42S 036-50W,…cancelled by · 2002-08-28
Nearby now · within 120 nm
- Odas buoy bravo rn-l temporarily established until 20 oct in 04-53.00S 035-46.01WNav aids · 65.4 nm
- Odas buoy established in 05-09.46S 035-09.81WNav aids · 104.4 nm
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.