Cable ops
Seismic survey in progress until further notice by M/V polar duchess towing 12 7050 meter long cables in: a.…
Norwegian Sea · HYDROLANT 944/15
- issued
- 2015-04-20 13:30Z
- status
- cancelled 2015-05-31 15:20Z (archive)
- authority
- NAVAREA XIX 33/15 191830Z APR 15 - NAVAREA XIX 35/15 191830Z APR 15.
- position
- 71.246, 19.721
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
NORWEGIAN SEA. DNC 20, DNC 21, DNC 22. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V POLAR DUCHESS TOWING 12 7050 METER LONG CABLES IN: A. 70-48.4N 020-12.2E. B. 70-35.2N 018-27.8E. C. 70-41.4N 018-07.8E. D. 72-07.3N 020-00.2E. E. 72-01.5N 021-48.3E. WIDE BERTH REQUESTED.
This area · cable & pipeline work
40 within 180 nm since 2006 · 0 in the last 12 months · 0 in force now
06
10
15
20
21
- Cable operations in progress until 05 nov by cableship ile de batz along tracklines joining: a. 72-22.4N…2021-10-16
- Cable operations in progress until 05 nov by cableship ile de batz along tracklines joining: a: 72-22.4N…2021-09-03
- Cable operations 080600Z may thru 282359Z jun by cableship ile de batz in vicinity of trackline joining…2021-05-06
- Seismic survey in progress until 20 nov by M/V bgp prospector towing ten 8000 meter long cables in area…2016-11-05
- Seismic survey in progress until 20 nov by M/V bgp prospector towing ten 8000 meter long cables in area…2016-11-04
- Seismic survey 20 sep thru 02 nov by M/V bgp prospector towing ten 8000 meter long cables in area bound by…2016-09-18
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.