Cable ops
Seismic survey in progress until 26 may by M/V nordic energy towing 8000 meter long cable in area bound by…
Indonesia · Flores Sea · HYDROPAC 1401/13
- issued
- 2013-05-15 23:16Z
- status
- cancelled 2013-05-27 00:01Z (archive)
- cancels
- HYDROPAC 1380/13
- authority
- NAVAREA XI 364/13 152310Z MAY 13.
- position
- -7.325, 119.486
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
INDONESIA. FLORES SEA. 1. SEISMIC SURVEY IN PROGRESS UNTIL 26 MAY BY M/V NORDIC ENERGY TOWING 8000 METER LONG CABLE IN AREA BOUND BY 06-54.1S 122-48.5E, 07-04.0S 122-49.5E, 07-45.0S 116-06.5E, 07-35.5S 116-06.0E. 2. CANCEL HYDROPAC 1380/13. 3. CANCEL THIS MSG 27 MAY 13.
This area · cable & pipeline work
11 within 180 nm since 2002 · 0 in the last 12 months · 0 in force now
02
05
10
15
20
22
- Cable operations in progress until further notice by cableship rene descartes along trackline joining…2022-10-17
- Cable operations in progress until further notice by cableship ile de re along trackline joining 05-23S…2017-09-01
- Cable operations 25 thru 28 dec by cableship ile de batz within one mile of 05-54.5S 120-14.7E2016-12-24
- Indonesia2016-11-02
- Seismic survey 15 thru 31 dec by M/V nordic energy towing 8000 meter long cable in area bound by 08-04S…2012-12-13
- Seismic survey 05 thru 15 dec by M/V nordic energy towing 8000 meter long cable in areas bound by: a. 07-00S…2012-12-02
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.