Cable ops
Seismic survey 05 thru 15 dec by M/V nordic energy towing 8000 meter long cable in areas bound by: a. 07-00S…
Indonesia · Flores Sea · HYDROPAC 3411/12
- issued
- 2012-12-02 23:44Z
- status
- cancelled 2012-12-16 00:01Z (archive)
- authority
- NAVAREA XI 805/12 022327Z DEC 12.
- position
- -7.514, 118.248
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
INDONESIA.
FLORES SEA.
1. SEISMIC SURVEY 05 THRU 15 DEC BY M/V NORDIC ENERGY
TOWING 8000 METER LONG CABLE IN AREAS BOUND BY:
A. 07-00S 118-52E, 07-08S 118-55E,
08-01S 116-37E, 07-52S 116-35E.
B. 07-00S 118-36E, 06-54S 118-44E,
07-55S 119-49E, 07-59S 119-41E.
2. CANCEL THIS MSG 16 DEC 12.
This area · cable & pipeline work
15 within 180 nm since 2002 · 0 in the last 12 months · 0 in force now
02
05
10
15
20
22
- Cable operations in progress until 20 oct by cableship rene descartes along trackline joining 04-39.7S…2022-10-03
- Cable operations in progress until further notice by cableship ile de re along trackline joining 05-23S…2017-09-01
- Cable operations 25 thru 28 dec by cableship ile de batz within one mile of 05-54.5S 120-14.7E2016-12-24
- Indonesia2016-11-02
- Seismic survey in progress until 26 may by M/V nordic energy towing 8000 meter long cable in area bound by…2013-05-15
- Seismic survey 15 thru 31 dec by M/V nordic energy towing 8000 meter long cable in area bound by 08-04S…2012-12-13
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.