Cable laying operations by cableship ile de sein 12 jun thru 10 jul vicinity of trackline joining 05-33.8N…
Malacca Strait · HYDROPAC 1679/14
What this record establishes
Archived notice · 2014-07-03 12:28Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA XI 433/14 111104Z JUN 14.. Issued 2014-06-11 12:36Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Malacca Strait. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
Related notices and cancellation links
- Cancel HYDROPAC 1679/14 and this msg, operations completedlater cancellation notice
Current notices and reporting history in the Malacca Strait →
- issued
- 2014-06-11 12:36Z
- status
- Archived notice
- authority
- NAVAREA XI 433/14 111104Z JUN 14.
- NAVAREA
- NAVAREA XI · named as the source of this relay
- sea
- Malacca Strait
- position
- 5.762, 99.220
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
STRAIT OF MALACCA. 1. CABLE LAYING OPERATIONS BY CABLESHIP ILE DE SEIN 12 JUN THRU 10 JUL VICINITY OF TRACKLINE JOINING 05-33.8N 100-21.7E, 05-44.1N 099-55.8E, 05-45.8N 099-46.2E, 05-44.3N 099-10.8E, 05-53.5N 098-03.4E. 2. CANCEL THIS MSG 11 JUL 14.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
Collected reports in this area · cable & pipeline work
22 within 180 nm since 2005 · 1 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations 29 dec until further notice by cableship rene descartes in vicinity of trackline joining…2025-12-28
- Cable operations in progress until 11 feb by cableship resolute along trackline joining 06-52.9N 097-27.9E,…2024-02-02
- Cable operations in progress until further notice by cableship resolute in vicinity of trackline joining…2023-11-06
- Cable operations 10 thru 18 oct by cableship peter faber in vicinity of trackline joining 06-45.04N…2023-10-09
- Cable operations 29 jul until further notice by cableship teneo in vicinity 05-51.00N 100-42.49E2023-07-27
- Underwater operations 30 mar until further notice by cableship teneo along trackline joining 02-41.90N…2023-03-29
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-10-03 05:08Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.