Cable repair operations in progress until further notice by c/s lodbrog vicinity 08-59.8N 108-13.2E
South China Sea · HYDROPAC 19/17
What this record establishes
Archived notice · 2017-01-13 13:42Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA XI 2/17 031133Z JAN 17.. Issued 2017-01-03 11:38Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- South China Sea. The parsed report position is 8.997, 108.220. It is a position in the source message, not a live location. Check the original wording for limits and qualifications.
Related notices and cancellation links
- Cancel HYDROPAC 19/17 and this msg, operations completedlater cancellation notice
Current notices and reporting history in the South China Sea →
- issued
- 2017-01-03 11:38Z
- status
- Archived notice
- authority
- NAVAREA XI 2/17 031133Z JAN 17.
- NAVAREA
- NAVAREA XI · named as the source of this relay
- sea
- South China Sea
- position
- 8.997, 108.220
- vessel
- C/S LODBROG · 12 messages
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
SOUTH CHINA SEA. DNC 11. CABLE REPAIR OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY C/S LODBROG VICINITY 08-59.8N 108-13.2E.
Reading this warning
- DNC (Digital Nautical Chart)
- A reference to one of the regions of NGA's Digital Nautical Chart, used to tell the reader which charts a warning affects.
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Until further notice
- The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
Collected reports in this area · cable & pipeline work
88 within 180 nm since 2001 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations until further notice by cableship teneo in 06-47.46N 109-19.20E2024-03-25
- Cable operations 28 jan thru 06 feb by c/s teneo in vicinity 06-47.46N 109-19.20E2024-01-27
- Cable operations 05 thru 14 jul by cableship teneo in vicinity of 07-30.0N 109-06.2E2021-07-04
- Pipeline operations 10 jun thru 31 oct by M/V nile river in vicinity of trackline joining 10-22.2N…2020-06-05
- Pipeline operations in progress until 11 sep by M/V nile river in vicinity of trackline joining 10-22.19N…2020-03-30
- Survey and pipeline operations in progress until 15 oct by M/V ptsc thang long along trackline joining…2019-04-18
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Oil rig reported to exists in 07-47.5N 108-12.0EWrecks · 72.4 nm
- Oil rig reported to exists in 07-42.1N 107-55.8EWrecks · 79.6 nm
- Dangerous wreck in 10-22.31N 107-46.96EWrecks · 86.5 nm
- Sunken wreck exists in 10-22.31N 107-46.96EWrecks · 86.5 nm
Worldwide in the collected sources
22 cable & pipeline work listed in force · see all
Record snapshot 2026-09-26 17:43Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.