Cable ops
Seismic survey in progress until 30 jul by M/V nordic energy towing 4500 meter long cable in area bound by…
Java Sea · HYDROPAC 2032/11
- issued
- 2011-07-15 07:12Z
- status
- cancelled 2011-07-31 00:00Z (archive)
- authority
- NAVAREA XI 520/11 150647Z JUL 11.
- position
- -6.676, 112.227
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
JAVA SEA. 1. SEISMIC SURVEY IN PROGRESS UNTIL 30 JUL BY M/V NORDIC ENERGY TOWING 4500 METER LONG CABLE IN AREA BOUND BY 06-35.0S 111-58.0E, 06-45.0S 111-58.0E, 06-50.0S 112-26.5E, 06-32.0S 112-26.5E. 2. CANCEL THIS MSG 31 JUL.
This area · cable & pipeline work
19 within 180 nm since 2001 · 0 in the last 12 months · 0 in force now
01
05
10
15
18
- Cable operations 07 mar thru 07 apr by cableship ile de re in vicinity of trackline joining 06-53S 113-07E,…2018-03-06
- Seismic survey in progress until 15 feb 14 by M/V cgg amadeus towing eight 6000 meter long cables in area…2013-12-28
- Seismic survey 042000Z mar to 010001Z may by M/V mezen towing 8300 meter long cable in area bound by 07-58S…2010-03-04
- Submarine cable operations 07 thru 13 jan by cableship ile de re vicinity trackline between 06-50.3S…2009-01-06
- Cable laying operations in progress until 06 jan 09 by M/V ile de re vicinity of trackline joining 05-44.7S…2008-12-26
- Cable laying operations in progress until 23 dec by M/V ile de re vicinity of trackline joining 06-05.6S…2008-12-14
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.