Cable laying operations in progress until 23 dec by M/V ile de re vicinity of trackline joining 06-05.6S…
Java Sea · HYDROPAC 2486/08
What this record establishes
Archived notice · 2008-12-24 00:00Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA XI 767/08 14 DEC 08.. Issued 2008-12-14 10:50Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Java Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
- issued
- 2008-12-14 10:50Z
- status
- Archived notice
- authority
- NAVAREA XI 767/08 14 DEC 08.
- NAVAREA
- NAVAREA XI · named as the source of this relay
- sea
- Java Sea
- position
- -5.983, 112.749
- vessel
- M/V ILE DE RE · 31 messages
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
1. CABLE LAYING OPERATIONS IN PROGRESS UNTIL 23 DEC BY M/V ILE DE RE VICINITY OF TRACKLINE JOINING 06-05.6S 112-30.1E, 06-14.2S 112-34.8E, 05-57.5S 112-52.5E, 05-42.8S 112-53.4E, 05-44.7S 112-44.1E. 2. CANCEL THIS MSG 24 DEC.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
Collected reports in this area · cable & pipeline work
21 within 180 nm since 2001 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations 27 oct until further notice by cableship ile de re in vicinity of trackline joining…2023-10-26
- Cable operations 07 mar thru 07 apr by cableship ile de re in vicinity of trackline joining 06-53S 113-07E,…2018-03-06
- Cable operations 06 feb thru 21 mar by cableship ile de re in vicinity of trackline joining 05-04S 117-27E,…2018-02-04
- Seismic survey in progress until 15 feb 14 by M/V cgg amadeus towing eight 6000 meter long cables in area…2013-12-28
- Seismic survey in progress until 30 jul by M/V nordic energy towing 4500 meter long cable in area bound by…2011-07-15
- Submarine cable operations 07 thru 13 jan by cableship ile de re vicinity trackline between 06-50.3S…2009-01-06
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Sunken wreck, exists in 04-32-31.8S 114-01-36.0EWrecks · 115.4 nm
- Sunken wreck, exists in 04-14-42S 113-44-18EWrecks · 119.9 nm
Worldwide in the collected sources
24 cable & pipeline work listed in force · see all
Record snapshot 2026-10-01 21:42Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.