Cable ops

Cable operations by the cable ship Ile de Re are underway in the Java Sea and Makassar Strait from October 27 until further notice.

Java Sea · HYDROPAC 3390/23

What this record establishes

Cancelled notice · 2026-08-14 18:10Z

This notice disappeared from the issuing source's in-force list. No explicit recovery or all-clear is established by that removal.

Source and dates
NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA XI 366/23 261210Z OCT 23.. Issued 2023-10-26 12:56Z. First collected 2026-08-17 13:41Z; last seen in collection 2026-08-17 15:50Z. Collection dates record ingestion, not a new incident or a fresh field observation.
Location covered
Java Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.

Current notices and reporting history in the Java Sea →

issued
2023-10-26 12:56Z
status
Cancelled notice
authority
NAVAREA XI 366/23 261210Z OCT 23.
NAVAREA
NAVAREA XI · named as the source of this relay
sea
Java Sea
position
-4.437, 114.278
source
NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:41Z

Original warning text

JAVA SEA.
MAKASSAR STRAIT.
INDONESIA.
DNC 04.
CABLE OPERATIONS 27 OCT UNTIL FURTHER NOTICE
BY CABLESHIP ILE DE RE IN VICINITY OF
TRACKLINE JOINING
01-49.53S 118-32.18E, 02-18.48S 118-26.90E,
03-16.52S 118-40.25E, 04-58.45S 117-27.37E,
04-38.56S 116-26.41E, 05-03.47S 113-10.98E,
04-50.35S 110-13.71E, 04-11.67S 108-07.67E.
WIDE BERTH REQUESTED.

Reading this warning

DNC (Digital Nautical Chart)
A reference to one of the regions of NGA's Digital Nautical Chart, used to tell the reader which charts a warning affects.
Cable operations
A ship is laying, burying or repairing a submarine cable, usually along a stated route.
Until further notice
The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
Track line joining
Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
Position (degrees and minutes)
How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
Wide berth requested
Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.

All warning terms →

Collected reports in this area · cable & pipeline work

21 within 180 nm since 2001 · 0 in the last 12 months · 0 listed in force now

01
05
10
15
20
23

Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.

Month of issue in the collected archive

J
F
M
A
M
J
J
A
S
O
N
D

All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.

Nearby notices listed in force · within 120 nm

Worldwide in the collected sources

23 cable & pipeline work listed in force · see all

Record snapshot 2026-09-27 19:52Z; source collection times vary.

Cable ops

Cable laying, pipeline and seismic operations. All current cable & pipeline work →

Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.