Cable operations in progress until 07 jul by cableship ile de re in vicinity of trackline joining 01-10.09N…
Malacca Strait · HYDROPAC 2039/23
What this record establishes
Archived notice · 2023-07-08 00:01Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA XI 217/23 200049Z JUN 23.. Issued 2023-06-20 00:53Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Malacca Strait. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
Related notices and cancellation links
Current notices and reporting history in the Malacca Strait →
- issued
- 2023-06-20 00:53Z
- status
- Archived notice
- self-cancels
- 2023-07-08 00:01Z
- authority
- NAVAREA XI 217/23 200049Z JUN 23.
- NAVAREA
- NAVAREA XI · named as the source of this relay
- sea
- Malacca Strait
- position
- 1.777, 102.313
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
SINGAPORE STRAIT. STRAIT OF MALACCA. INDONESIA. DNC 03. 1. CABLE OPERATIONS IN PROGRESS UNTIL 07 JUL BY CABLESHIP ILE DE RE IN VICINITY OF TRACKLINE JOINING 01-10.09N 103-24.36E, 01-12.67N 103-21.07E, 01-15.35N 103-11.81E, 01-17.26N 103-03.52E, 02-10.91N 101-37.44E, 02-32.41N 101-19.52E. WIDE BERTH REQUESTED. 2. CANCEL HYDROPAC 2038/23. 3. CANCEL THIS MSG 080001Z JUL 23.
Reading this warning
- DNC (Digital Nautical Chart)
- A reference to one of the regions of NGA's Digital Nautical Chart, used to tell the reader which charts a warning affects.
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
- Cancellation reference
- A line that cancels an earlier warning by its number, such as CANCEL HYDROLANT 1085/12.
- HYDROPAC
- The U.S. long-range warning series for the Pacific outside NAVAREA XII and for the Indian Ocean, Persian Gulf and adjoining seas.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
- Date-time group (DTG)
- A compact UTC timestamp — day, hour and minute followed by Z — such as 201500Z for the 20th at 15:00 UTC.
Collected reports in this area · cable & pipeline work
135 within 180 nm since 1999 · 10 in the last 12 months · 2 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations in progress until further notice by cableship peter faber in vicinity 01-16.75N 104-08.14E2026-09-25
- Submarine cable repairing works by c/v peter faber, 23 sep to until further notice2026-09-25
- Cable operations 23 sep until further notice by cableship peter faber in vicinity 01-16.75N 104-08.14E2026-09-22
- Submarine cable repairing works by c/v peter faber, 23 sep to until further notice2026-09-22
- Cable operations in progress until further notice by cableship peter faber along trackline joining 02-04.23N…2026-09-17
- Submarine cable repairing works by c/v peter faber, until further notice2026-09-17
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Batu berhanti isolated danger marks light buoy, 01-11.76N 103-52.51E, temporarily removedNav aids · 100 nm
- Batu berhanti isolated danger light buoy 01-11.76N 103-52.51E temporarily removedNav aids · 100 nm
- Submarine cable repairing works by c/v peter faber, 23 sep to until further noticeCable ops · 113.4 nm
- Cable operations in progress until further notice by cableship peter faber in vicinity 01-16.75N 104-08.14ECable ops · 113.4 nm
Worldwide in the collected sources
24 cable & pipeline work listed in force · see all
Record snapshot 2026-10-01 08:46Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.