Cable ops
Seismic survey in progress until further notice by M/V pacific titan towing 10000 meter long cable in area…
HYDROPAC 2195/08
- issued
- 2008-11-07 12:12Z
- status
- cancelled 2008-11-13 00:12Z (archive)
- cancels
- HYDROPAC 2166/08HYDROPAC 2059/08
- authority
- CNW 120/08 070922Z NOV 08.
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V PACIFIC TITAN TOWING 10000 METER LONG CABLE IN AREA BETWEEN 38-30S 40-30S AND 171-10E 173-10E. EIGHT MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 2166/08(81) AND 2191/08(74). 3. CANCEL HYDROPAC 2059/08.
Timeline
- Seismic survey in progress until further notice by M/V pacific titan towing 8000 meter long cable along…cancels · 2008-10-22
- Nga chart 81076(12TH ed)cancels · 2008-11-01
- Seismic survey in progress until further notice by M/V pacific titan towing 8000 meter long cable along…replaced · 2008-10-22
- Nga chart 81076(12TH ed)replaced · 2008-11-01
- Nga chart 74290 (11TH ed)replaced · 2008-11-05
- Seismic survey in progress until further notice by M/V pacific titan towing 4000 meter long cable in area…cancelled by · 2008-11-13
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.