Cable ops
Seismic survey in progress until further notice by M/V polar duke towing 3.5 mile long cable in area bound…
HYDROPAC 227/04
- issued
- 2004-02-06 10:10Z
- status
- cancelled 2004-02-24 03:10Z (archive)
- cancels
- HYDROPAC 224/04HYDROPAC 116/04
- authority
- AUSCOAST 32/04 060059Z FEB 04; MARITIME OPS NEW ZEALAND MSA 29/04 POR EGC#931 060730Z FEB 04
- position
- -33.141, 152.058
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY M/V POLAR DUKE TOWING 3.5 MILE LONG CABLE IN AREA BOUND BY 33-26.3S 151-29.6E, 33-09.1S 151-39.5E, 32-52.3S 151-59.6E, 32-40.2S 152-25.6E, 32-55.5S 152-41.2E, 33-39.5S 151-44.2E. FIVE MILE BERTH REQUESTED. 2. CANCEL HYDROPAC 224/04(83), VESSEL ASSISTED. 3. CANCEL HYDROPAC 116/04.
This area · cable & pipeline work
37 within 180 nm since 2000 · 0 in the last 12 months · 0 in force now
00
05
10
15
20
21
- Underwater operations in progress until further notice by cableship ile de sein in area bound by 33-54S…2021-12-11
- Underwater operations in progress by cableship ile de brehat in area bound by 33-42S 151-18E, 33-42S…2020-01-09
- Cable operations in progress until further notice by cableship ile de brehat along trackline joining 33-43S…2019-11-26
- Underwater operations in progress until further notice by cableship ile de brehat along trackline joining…2019-11-17
- Underwater operations in progress until further notice by cableship ile de brehat in area bound by 33-54.50S…2019-09-28
- Cable operations in progress until further notice by cableship ile de brehat along trackline joining…2019-09-12
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until further notice by M/V polar duke towing 6485 meter long cable in area bound…cancels · 2004-01-21
- Distress signal received on 406 mhz vicinity 11-35S 173-02Wcancels · 2004-02-05
- Seismic survey in progress until further notice by M/V polar duke towing 6485 meter long cable in area bound…replaced · 2004-01-21
- Distress signal received on 406 mhz vicinity 11-35S 173-02Wreplaced · 2004-02-05
- Seismic survey in progress until further notice by M/V polar duke towing 3.7 mile long cable in area bound…cancelled by · 2004-02-24
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.