Cable ops
Submarine cable operations in progress until 31 mar by vessel vicinity of tracklines joining: a. 31-28.8N…
HYDROPAC 290/01
- issued
- 2001-02-21 11:10Z
- status
- cancelled 2001-04-01 00:00Z (archive)
- cancels
- HYDROPAC 273/01HYDROPAC 276/01HYDROPAC 248/01HYDROPAC 283/01
- authority
- NAVAREA XI 98/01 210808Z FEB 01; MENAS 16/01 E-MAIL 21 FEB; JRCC STAVANGER IOR EGC #1459 210815Z FEB 01; RCC AUSTRALIA POR EGC #48308 210817Z FEB 01
- position
- 31.230, 123.228
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SUBMARINE CABLE OPERATIONS IN PROGRESS UNTIL 31 MAR
BY VESSEL VICINITY OF TRACKLINES JOINING:
A. 31-28.8N 122-32.0E, 31-28.3N 123-02.2E,
31-11.4N 123-28.0E, 30-50.7N 123-55.4E.
B. 31-22.9N 122-32.0E, 31-22.9N 123-00.0E,
31-07.4N 123-23.9E, 30-47.4N 123-45.7E.
2. CANCEL HYDROPAC 273/01(62), AID RESTORED.
3. CANCEL HYDROPAC 276/01(61,62,63), VESSEL LOCATED SAFE.
4. CANCEL HYDROPAC 248/01, 283/01(74) AND 285/01(21).
5. CANCEL THIS MSG 01 APR.
This area · cable & pipeline work
125 within 180 nm since 1998 · 0 in the last 12 months · 0 in force now
98
00
05
10
15
20
23
- Cable operations in progress until 06 jun by cableship peter faber in area bound by 33-48.60N 124-37.20E,…2023-05-27
- Cable operations 24 thru 30 may, alternate 31 may thru 02 jun by cableship kddi ocean link in area bound by…2023-05-23
- Cable operations 18 thru 23 nov, alternate 24 thru 29 nov by cableship fu hai along trackline joining…2021-11-17
- Cable operations 10 thru 15 nov, alternate 16 thru 21 nov by cableship fu hai along trackline joining…2021-11-09
- Cable operations 03 thru 10 nov, alternate 11 thru 16 nov by cableship fu hai in area bound by 29-53.5N…2021-11-01
- Cable operations 19 thru 23, alternate 24 thru 30 oct by cableship fu hai in area bound by 30-22.7N…2021-10-18
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Submarine cable operations 16 thru 23 feb by M/V kdd ocean link in area between 30-30N 30-38N and 125-00E…cancels · 2001-02-15
- Bahrain buoy 26-33.1N 051-03.5E missingcancels · 2001-02-18
- 2 meter S/V hunny bear of hayling, green hull, two persons on board, overdue sri lanka to djibouticancels · 2001-02-19
- Seven meter barge adrift vicinity hardy reef (19-45S 149-15E) at 201100Z febcancels · 2001-02-20
- Submarine cable operations 16 thru 23 feb by M/V kdd ocean link in area between 30-30N 30-38N and 125-00E…replaced · 2001-02-15
- Bahrain buoy 26-33.1N 051-03.5E missingreplaced · 2001-02-18
- 2 meter S/V hunny bear of hayling, green hull, two persons on board, overdue sri lanka to djiboutireplaced · 2001-02-19
- Seven meter barge adrift vicinity hardy reef (19-45S 149-15E) at 201100Z febreplaced · 2001-02-20
- Derelict 40 foot M/V, white hull, partially submerged and adrift vicinity 13-25N 100-24W at 171800Z febreplaced · 2001-02-20
Nearby now · within 120 nm
- Large buoy reported to exist in 31-00N 124-00EWrecks · 42 nm
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.