Cable ops
Seismic survey 10 feb thru 20 mar by M/V geco topaz towing six five mile long cables in area bound by 08-39N…
HYDROPAC 313/09
- issued
- 2009-02-09 15:26Z
- status
- cancelled 2009-02-16 14:58Z (archive)
- authority
- NAVAREA VIII 75/09 091001Z FEB 09.
- position
- 8.700, 79.025
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY 10 FEB THRU 20 MAR BY M/V GECO TOPAZ TOWING SIX FIVE MILE LONG CABLES IN AREA BOUND BY 08-39N 078-41E, 08-23N 078-53E, 08-45N 079-22E, 09-01N 079-10E. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 21 MAR.
This area · cable & pipeline work
25 within 180 nm since 2002 · 0 in the last 12 months · 0 in force now
02
05
10
15
20
- Cable operations in progress until further notice by cableship niwa in area bound by 04-35N 077-04E, 05-16N…2020-11-24
- Cable laying operations by cableship ile de batz: a. 10 thru 13 jun along trackline joining 07-40.91N…2015-06-09
- Seismic survey in progress until 10 and 13 thru 18 mar by M/V samdura ratnakar towing four mile long cable…2015-02-18
- Seismic survey in progress until 30 nov by M/V brahmputra dolphin, M/V kohinoor-i and M/V sunrise-ii towing…2014-09-03
- Seismic survey in progress until 04 sep by M/V brahmputra dolphin, M/V kohinoor-i and M/V sunrise-ii towing…2014-08-18
- Seismic survey 221831Z dec to 281830Z feb 12 by M/V arctemis arctic towing four 8500 meter long cables in…2011-12-19
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Cancel HYDROPAC 313/09, 321/09, and 333/09cancelled by · 2009-02-16
Nearby now · within 120 nm
- RACON at muttam point light 08-07.37N 077-19.05E inoperativeNav aids · 107.2 nm
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.